[BTeam] morning update

Arne Freyberger freyberg at jlab.org
Tue Feb 24 07:36:34 EST 2015


  * Lots of quad scan data to look at.  This data was taken in order to
    fine tune the configuration files for a second round of quad scans.
  * Maintenance day today
  * Tonight/tomorrow morning RTI test
  * wednesday 750MHz separation: First look


  Spring 2015 Startup Evolution


    1 Spring 2015 Startup OPS


      1.1 Spreadsheet

  * Run Spread Sheet
    <https://docs.google.com/spreadsheets/d/1AMVnjOjYZAqxLSQI_bzgt4cbmZlRY0DIh6uUaYCadPk/pubhtml>

  * Please send me your gmail address if you wish to have edit privileges

 1. Emittance list
     1. |[2/2]| Inj emittance/TWISS measurements

        |[X]| INJ X file
            IHA0L07_x_APF.xml
              * elogs: 3321686 <https://logbooks.jlab.org/entry/3321686>
                3321687 <https://logbooks.jlab.org/entry/3321687>
                3321688 <https://logbooks.jlab.org/entry/3321688>
        |[X]| INJ Y file
            IHA0L07_y_AH.xml
              * elogs: 3321689 <https://logbooks.jlab.org/entry/3321689>
                3321690 <https://logbooks.jlab.org/entry/3321690>

     2. |[2/2]| 1E emittance/TWISS measurements

        |[X]| 1E X file
            IHA1E03-x.xml
              * elogs: 3321709 <https://logbooks.jlab.org/entry/3321709>
                3321709 <https://logbooks.jlab.org/entry/3321709>
        |[X]| 1E Y file
            IHA1E03-y.xml 

     3. |[2/2]| *2E* emittance/TWISS measurements

        |[X]| 2E X file
            IHA2E01-x-broad.xml 
        |[X]| 2E Y file
            IHA2E01-y-broad.xml 

     4. |[2/2]| *3E* emittance/TWISS measurements

        |[X]| 3E X file
            IHA3E01-x-broad.xml 
        |[X]| 3E Y file
            IHA3E01-y-broad.xml 

     5. |[2/2]| *4E* emittance/TWISS measurements

        |[X]| 4E X file
            IHA4E01-x-broad.xml 
        |[X]| 4E Y file
            IHA4E01-y-broad.xml 

     6. |[2/2]| *5E* emittance/TWISS measurements

        |[X]| 5E X file
            IHA5E01-x-broad.xml 
        |[X]| 5E Y file
            IHA5E01-y-broad.xml 

     7. |[2/2]| *6E* emittance/TWISS measurements

        |[X]| 6E X file
            IHA6E01-x-broad.xml 
        |[X]| 6E Y file
            IHA6E01-y-broad.xml 

     8. |[2/2]| *8E* emittance/TWISS measurements

        |[X]| 8E X file
            IHA8E01-x-broad.xml 
        |[X]| 8E Y file
            IHA8E01-y-broad.xml 

     9. |[2/2]| *9E* emittance/TWISS measurements

        |[X]| 9E X file
            IHA9E01-x-broad.xml 
        |[X]| 9E Y file
            IHA9E01-y-broad.xml 

    10. |[0/2]| *AE* emittance/TWISS measurements

        |[ ]| AE X file
            IHAAE01-x-broad.xml 
        |[ ]| AE Y file
            IHAAE01-y-broad.xml 

    11. |[0/2]| *5C* emittance/TWISS measurements

        |[ ]| 5C X file
            IHA5C00-x-broad.xml 
        |[ ]| 5C Y file
            IHA5C00-y-broad.xml 

    12. |[0/2]| *1C* emittance/TWISS measurements

        |[ ]| 1C X file
            IHA1C05-x-broad.xml 
        |[ ]| 1C Y file
            IHA1C05-y-broad.xml 

    13. |[0/2]| *2C* emittance/TWISS measurements

        |[ ]| 2C X file
            IHA2C04-x-broad.xml 
        |[ ]| 2C Y file
            IHA2C04-y-broad.xml 


      1.2 Maintenance Tasks

 1. |[0/7]| Scheduled
      * |[ ]| West Arc Power Loop configuration (4h)
      * |[ ]| Resurrect 1L05 (instantaneous)
      * |[ ]| 1L22-8 LLRF Tuning issues 3321143
        <https://logbooks.jlab.org/entry/3321143>
      * |[ ]| Replace failed B laser amplifier (4-6h)
      * |[ ]| Replace IHA1C07 A&B motors
      * |[ ]| insertable software no beam tests
      * |[ ]| 750MHz power test
 2. |[0/1]| On hold
      * |[ ]| Replace Inj sync. camera
 3. |[4/4]| Completed
      * |[X]| Align INJ Sync. Light Monitor (Thursday Morning)
      * |[X]| Verify Yao cavity electronics in tunnel (Thursday Morning?)
      * |[X]| MARC6++ Water Flow–Acid Flush
      * |[X]| RSEP9A Acid flush


      1.3 2015-02-22 Sun

 1. |[1/1]| Owl
      * |[X]| Continue ORFP post frequency change
          o Beam to 5C
          o Pathlength looks good
          o Upper passes under evaluation
 2. |[4/5]| Day
      * |[X]| Continue ORFP post frequency change
          o hopefully converging by noon
      * |[X]| 1-pass beam to BSY dump
      * |[ ]| Go CW!
          o BLM limitations
      * |[X]| Inj. Optimization with 1-pass beam
          o inline dump optimization: 3321636
            <https://logbooks.jlab.org/entry/3321636>
 3. |[4/4]| Swing
      * |[X]| Bunch length measurement at Inj. Spectrometer Dump
          o elogs: 3321645 <https://logbooks.jlab.org/entry/3321645>
            3321646 <https://logbooks.jlab.org/entry/3321646> 3321648
            <https://logbooks.jlab.org/entry/3321648> 3321649
            <https://logbooks.jlab.org/entry/3321649>
      * |[X]| Calibrate the Inj, Arc1 and Arc2 sync. light monitors.
          o ATLis: 14708
            <http://opsweb.acc.jlab.org/CSUEApps/atlis/task/14708>
          o elogs: 3321682 <https://logbooks.jlab.org/entry/3321682>
            3321683 <https://logbooks.jlab.org/entry/3321683>
      * |[X]| Restore tune-mode beam to 5C dumplet (or convenient ODD
        dumplet)
      * |[X]| 1.1.1 <#Quad-scan>
          o started


      1.4 2015-02-23 Mon

 1. |[3/3]| Owl
      * |[X]| Bunch length measurement in NL/ARC1
          o elogs: 3321667 <https://logbooks.jlab.org/entry/3321667>
            3321668 <https://logbooks.jlab.org/entry/3321668> 3321675
            <https://logbooks.jlab.org/entry/3321675>
      * |[X]| Restore tune-mode beam to 5C dumplet (or convenient ODD
        dumplet)
      * |[X]| Quad scans: 1.1.1 <#Quad-scan>
 2. |[1/1]| Day
      * |[X]| 50μ A CW to BSY dump
          o achieved with the C-laser
          o A-laser appears to generate tails preventing CW beam above
            20 μ A
 3. |[1/1]| Swing
      * |[X]| Continue 1.1.1 <#Quad-scan>


      1.5 2015-02-24 Tue

 1. |[1/1]| Owl
      * |[X]| Continue 1.1.1 <#Quad-scan>
 2. |[0/3]| Day
      * |[ ]| Change CUE password
      * |[ ]| Maintenance start at 9am
          o |[ ]| West Arc Power Loop configuration (4h)
          o |[ ]| Resurrect 1L05 (instantaneous)
          o |[ ]| 1L22-8 LLRF Tuning issues 3321143
            <https://logbooks.jlab.org/entry/3321143>
          o |[ ]| Replace failed B laser amplifier (4-6h)
          o |[ ]| insertable software no beam tests
          o |[ ]| Replace IHA1C07 A&B motors
      * |[ ]| 2pm lock up Hall-A and B, DCpower magnet string test
 3. |[0/3]| Swing
      * |[ ]| Recover CEBAF
      * |[ ]| 50μ A 1-pass CW to BSY dump (C-laser)
      * |[ ]| RTI Commissioning (tentative)


      1.6 2015-02-25 Wed

 1. |[0/1]| Owl
      * |[ ]| RTI Commissioning (tentative)
 2. |[0/2]| Day
      * |[ ]| 750MHz beam commissioning: First Look
 3. |[0/1]| Swing
      * |[ ]| Unplanned activities
      * |[ ]| 750MHz beam commissioning: First Look


      1.7 2015-02-25 Thu

 1. Owl
      * |[ ]| ORFP

Author: Arne Freyberger

Created: 2015-02-24 Tue 07:33

Emacs <http://www.gnu.org/software/emacs/> 24.3.1 (Org 
<http://orgmode.org> mode 8.0-pre)

Validate XHTML 1.0 <http://validator.w3.org/check?uri=referer>


-- 
Arne Freyberger
Director of Accelerator Operations
Jefferson Lab
12000 Jefferson Avenue      Cell: (757) 876-6289
Postal Suite 19             Email:  freyberg at jlab.org
Newport News, VA 23606

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/bteam/attachments/20150224/78890d7a/attachment-0002.html>


More information about the BTeam mailing list