[BTeam] Morning Update

Arne Freyberger freyberg at jlab.org
Sun Feb 22 08:26:55 EST 2015


  * MO Adjustment behind us
  * ORFP sort-of completed, we will re-visit post
    Bunchlength/emittance/TWISS match exercise
  * 1-pass BSY setup underway


Once beam is establish to the BSY dump the Injector group (R.A.Y. = 
Reza, Alicia, Yan) will explore optimizing the Injector setup for CW 
beam.  This will be followed by bunch length measurements (Mahmoud, 
Tief) who are available post 4pm.

Arne


  Spring 2015 Startup Evolution


    1 Spring 2015 StartUp OPS


      1.1 Spreadsheet

  * Run Spread Sheet
    <https://docs.google.com/spreadsheets/d/1AMVnjOjYZAqxLSQI_bzgt4cbmZlRY0DIh6uUaYCadPk/pubhtml>

  * Please send me your gmail address if you wish to have edit privileges


      1.2 |[4/8]| Maintenance Tasks

  * |[ ]| 1L22-8 LLRF Tuning issues 3321143
    <https://logbooks.jlab.org/entry/3321143>
  * |[ ]| West Arc Power Loop configuration (4h)
  * |[ ]| Resurrect 1L05 (instantaneous)
  * |[ ]| Replace failed B laser amplifier (4-6h)
  * |[X]| Align INJ Sync. Light Monitor (Thursday Morning)
  * |[X]| Verify Yao cavity electronics in tunnel (Thursday Morning?)
  * |[X]| MARC6++ Water Flow–Acid Flush
  * |[X]| RSEP9A Acid flush


      1.3 2015-02-21 Sat

 1. |[1/1]| Owl
      * |[X]| ORFP to 5C
 2. |[3/3]| Day
      * |[X]| M56=0 ARC[1..5] 3321381
        <https://logbooks.jlab.org/entry/3321381>
      * |[X]| MO/Pathlength evaluation and decision
          o elogs 3321438 <https://logbooks.jlab.org/entry/3321438>
            3321439 <https://logbooks.jlab.org/entry/3321439> 3321446
            <https://logbooks.jlab.org/entry/3321446>
      * |[X]| Adjust MO frequency or not decision
          o yes the MO will be adjusted
 3. |[3/3]| Swing
      * |[X]| Adjust MO
          o |[X]| Adjust MO frequency by 2539Hz
          o |[X]| Rotate Dogs by 3degrees
          o |[X]| RF ON throughout
          o |[X]| remove/set arc offsets
      * |[X]| Pathlength QA
          o elogs: 3321550 <https://logbooks.jlab.org/entry/3321550>
            3321584 <https://logbooks.jlab.org/entry/3321584>
      * |[X]| Resume ORFP post frequency change


      1.4 2015-02-22 Sun

 1. |[1/1]| Owl
      * |[X]| Continue ORFP post frequency change
          o Beam to 5C
          o Pathlength looks good
          o Upper passes under evaluation
 2. |[1/6]| Day
      * |[X]| Continue ORFP post frequency change
          o hopefully converging by noon
      * |[ ]| 1-pass beam to BSY dump
      * |[ ]| Go CW!
      * |[ ]| Inj. Optimization with 1-pass beam
      * |[ ]| Calibrate the Inj, Arc1 and Arc2 sync. light monitors.
          o ATLis: 14708
            <http://opsweb.acc.jlab.org/CSUEApps/atlis/task/14708>
 3. |[0/1]| Swing
      * |[ ]| Bunch length measurement in NL/ARC1
      * |[ ]| Bunch length measurement at Inj. Spectrometer Dump
      * |[ ]| E[1..A,5C] emittance/TWISS measurements
          o match calculated offine.


      1.5 2015-02-23 Mon

 1. |[0/1]| Owl
      * |[ ]| E[1..A,5C] emittance/TWISS measurements
          o match calculated offine.
 2. |[0/5]| Day
      * |[ ]| Auto-quad test, beam to 1R (Joyce, 2h)
          o ATLis: 14419
            <http://devweb.acc.jlab.org/CSUEApps/atlis/task_view.php?task_id=14419>

      * |[ ]| Synchrotron radiation coil commissioning
      * |[ ]| Skew search (part of ATlis: 14931
        <http://opsweb.acc.jlab.org/CSUEApps/atlis/task/14931>)
      * |[ ]| Dogleg focusing test (Tief, 2h)
      * |[ ]| Load match values
      * |[ ]| ORFP 2nd iteration
 3. |[0/1]| Swing
      * |[ ]| ORFP 2nd iteration


      1.6 2015-02-24 Tue

 1. |[0/1]| Owl
      * |[ ]| ORFP 2nd iteration
 2. |[0/3]| Day
      * |[ ]| Change CUE password
      * |[ ]| Maintenance
          o |[ ]| Installed repaired Hall-B laser amplifier(8h)
          o |[ ]| 1L22-8 LLRF Tuning issues 3321143
            <https://logbooks.jlab.org/entry/3321143>
          o |[ ]| West Arc Power Loop configuration (4h)
          o |[ ]| Resurrect 1L05
      * |[ ]| 2pm lock up Hall-A and B, DCpower magnet string test
 3. |[0/1]| Swing
      * |[ ]| Recover INJ
      * |[ ]| RTI Commissioning (tentative)


      1.7 2015-02-25 Wed

 1. |[0/1]| Owl
      * |[ ]| RTI Commissioning (tentative)
 2. |[0/2]| Day
      * |[ ]| Change ACC password
      * |[ ]| Three beam setup (Inj)
 3. |[0/1]| Swing
      * |[ ]| Unplanned activities

Author: Arne Freyberger

Created: 2015-02-22 Sun 08:26

Emacs <http://www.gnu.org/software/emacs/> 24.3.1 (Org 
<http://orgmode.org> mode 8.0-pre)

Validate XHTML 1.0 <http://validator.w3.org/check?uri=referer>

-- 
Arne Freyberger
Director of Accelerator Operations
Jefferson Lab
12000 Jefferson Avenue      Cell: (757) 876-6289
Postal Suite 19             Email:  freyberg at jlab.org
Newport News, VA 23606

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/bteam/attachments/20150222/378fb5f5/attachment-0002.html>


More information about the BTeam mailing list