[BTeam] Morning Update
Arne Freyberger
freyberg at jlab.org
Sun Feb 22 08:26:55 EST 2015
* MO Adjustment behind us
* ORFP sort-of completed, we will re-visit post
Bunchlength/emittance/TWISS match exercise
* 1-pass BSY setup underway
Once beam is establish to the BSY dump the Injector group (R.A.Y. =
Reza, Alicia, Yan) will explore optimizing the Injector setup for CW
beam. This will be followed by bunch length measurements (Mahmoud,
Tief) who are available post 4pm.
Arne
Spring 2015 Startup Evolution
1 Spring 2015 StartUp OPS
1.1 Spreadsheet
* Run Spread Sheet
<https://docs.google.com/spreadsheets/d/1AMVnjOjYZAqxLSQI_bzgt4cbmZlRY0DIh6uUaYCadPk/pubhtml>
* Please send me your gmail address if you wish to have edit privileges
1.2 |[4/8]| Maintenance Tasks
* |[ ]| 1L22-8 LLRF Tuning issues 3321143
<https://logbooks.jlab.org/entry/3321143>
* |[ ]| West Arc Power Loop configuration (4h)
* |[ ]| Resurrect 1L05 (instantaneous)
* |[ ]| Replace failed B laser amplifier (4-6h)
* |[X]| Align INJ Sync. Light Monitor (Thursday Morning)
* |[X]| Verify Yao cavity electronics in tunnel (Thursday Morning?)
* |[X]| MARC6++ Water Flow–Acid Flush
* |[X]| RSEP9A Acid flush
1.3 2015-02-21 Sat
1. |[1/1]| Owl
* |[X]| ORFP to 5C
2. |[3/3]| Day
* |[X]| M56=0 ARC[1..5] 3321381
<https://logbooks.jlab.org/entry/3321381>
* |[X]| MO/Pathlength evaluation and decision
o elogs 3321438 <https://logbooks.jlab.org/entry/3321438>
3321439 <https://logbooks.jlab.org/entry/3321439> 3321446
<https://logbooks.jlab.org/entry/3321446>
* |[X]| Adjust MO frequency or not decision
o yes the MO will be adjusted
3. |[3/3]| Swing
* |[X]| Adjust MO
o |[X]| Adjust MO frequency by 2539Hz
o |[X]| Rotate Dogs by 3degrees
o |[X]| RF ON throughout
o |[X]| remove/set arc offsets
* |[X]| Pathlength QA
o elogs: 3321550 <https://logbooks.jlab.org/entry/3321550>
3321584 <https://logbooks.jlab.org/entry/3321584>
* |[X]| Resume ORFP post frequency change
1.4 2015-02-22 Sun
1. |[1/1]| Owl
* |[X]| Continue ORFP post frequency change
o Beam to 5C
o Pathlength looks good
o Upper passes under evaluation
2. |[1/6]| Day
* |[X]| Continue ORFP post frequency change
o hopefully converging by noon
* |[ ]| 1-pass beam to BSY dump
* |[ ]| Go CW!
* |[ ]| Inj. Optimization with 1-pass beam
* |[ ]| Calibrate the Inj, Arc1 and Arc2 sync. light monitors.
o ATLis: 14708
<http://opsweb.acc.jlab.org/CSUEApps/atlis/task/14708>
3. |[0/1]| Swing
* |[ ]| Bunch length measurement in NL/ARC1
* |[ ]| Bunch length measurement at Inj. Spectrometer Dump
* |[ ]| E[1..A,5C] emittance/TWISS measurements
o match calculated offine.
1.5 2015-02-23 Mon
1. |[0/1]| Owl
* |[ ]| E[1..A,5C] emittance/TWISS measurements
o match calculated offine.
2. |[0/5]| Day
* |[ ]| Auto-quad test, beam to 1R (Joyce, 2h)
o ATLis: 14419
<http://devweb.acc.jlab.org/CSUEApps/atlis/task_view.php?task_id=14419>
* |[ ]| Synchrotron radiation coil commissioning
* |[ ]| Skew search (part of ATlis: 14931
<http://opsweb.acc.jlab.org/CSUEApps/atlis/task/14931>)
* |[ ]| Dogleg focusing test (Tief, 2h)
* |[ ]| Load match values
* |[ ]| ORFP 2nd iteration
3. |[0/1]| Swing
* |[ ]| ORFP 2nd iteration
1.6 2015-02-24 Tue
1. |[0/1]| Owl
* |[ ]| ORFP 2nd iteration
2. |[0/3]| Day
* |[ ]| Change CUE password
* |[ ]| Maintenance
o |[ ]| Installed repaired Hall-B laser amplifier(8h)
o |[ ]| 1L22-8 LLRF Tuning issues 3321143
<https://logbooks.jlab.org/entry/3321143>
o |[ ]| West Arc Power Loop configuration (4h)
o |[ ]| Resurrect 1L05
* |[ ]| 2pm lock up Hall-A and B, DCpower magnet string test
3. |[0/1]| Swing
* |[ ]| Recover INJ
* |[ ]| RTI Commissioning (tentative)
1.7 2015-02-25 Wed
1. |[0/1]| Owl
* |[ ]| RTI Commissioning (tentative)
2. |[0/2]| Day
* |[ ]| Change ACC password
* |[ ]| Three beam setup (Inj)
3. |[0/1]| Swing
* |[ ]| Unplanned activities
Author: Arne Freyberger
Created: 2015-02-22 Sun 08:26
Emacs <http://www.gnu.org/software/emacs/> 24.3.1 (Org
<http://orgmode.org> mode 8.0-pre)
Validate XHTML 1.0 <http://validator.w3.org/check?uri=referer>
--
Arne Freyberger
Director of Accelerator Operations
Jefferson Lab
12000 Jefferson Avenue Cell: (757) 876-6289
Postal Suite 19 Email: freyberg at jlab.org
Newport News, VA 23606
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/bteam/attachments/20150222/378fb5f5/attachment-0002.html>
More information about the BTeam
mailing list