[BTeam] Morning Update

Arne Freyberger freyberg at jlab.org
Fri Feb 20 08:38:00 EST 2015


Wheels are back on the wagon.   ORFP activities are on-going.   Very 
busy weekend of Inj. optimization, bunchlength and emittance measurements.
Arne


  Spring 2015 Startup Evolution


    1 Spring 2015 StartUp OPS


      1.1 Spreadsheet

  * Run Spread Sheet
    <https://docs.google.com/spreadsheets/d/1AMVnjOjYZAqxLSQI_bzgt4cbmZlRY0DIh6uUaYCadPk/pubhtml>

  * Please send me your gmail address if you wish to have edit privileges


      1.2 |[4/7]| Maintenance Tasks

  * |[ ]| 1L22-8 LLRF Tuning issues 3321143
    <https://logbooks.jlab.org/entry/3321143>
  * |[ ]| West Arc Power Loop configuration (4h)
  * |[ ]| Resurrect 1L05
  * |[X]| Align INJ Sync. Light Monitor (Thursday Morning)
  * |[X]| Verify Yao cavity electronics in tunnel (Thursday Morning?)
  * |[X]| MARC6++ Water Flow–Acid Flush
  * |[X]| RSEP9A Acid flush


      1.3 2015-02-19 Thu

 1. |[1/1]| Owl
      * |[X]| ORFP to 5C dumplet
 2. |[3/4]| Day
      * |[X]| Access into North Linac
          o |[X]| Laser Table alignment 3321136
            <https://logbooks.jlab.org/entry/3321136> 3321169
            <https://logbooks.jlab.org/entry/3321169>
          o |[X]| Inj. Sync Light alignment 3321126
            <https://logbooks.jlab.org/entry/3321126>
          o |[X]| YAO cavity electronics check 3321131
            <https://logbooks.jlab.org/entry/3321131>
          o |[X]| RSEP9A back flush
          o |[X]| Replace Lambertson camera 3321090
            <https://logbooks.jlab.org/entry/3321090>
          o |[X]| AR dumplet retraction/limit switch issue 3321114
            <https://logbooks.jlab.org/entry/3321114>
          o |[X]| MQK7S10 investigation 3321123
            <https://logbooks.jlab.org/entry/3321123>
          o |[X]| RADCON retrieval of SL instrumentation
          o |[X]| Buncher RF health check
              + Buncher tuned, found 10kHz off resonance
              + Makes/maintains gradient up to 19 now: 3321119
                <https://logbooks.jlab.org/entry/3321119>
      * |[X]| Mya Save/Restore Commissioning (CJS)
      * |[X]| Replace failed chopper-1X amplifier
      * |[ ]| Auto quad commissioning (Joyce)
          o did not happen due to Chopper-1X issue
 3. |[2/2]| Swing
      * |[X]| Recover Injector from LaserTable/Chopper-1X/Buncher work
      * |[X]| Continue ORFP to 5C dumplet
          o Verify M56=0 in Arc[1..5]


      1.4 2015-02-20 Fri

 1. |[1/1]| Owl
      * |[X]| ORFP to 6R
 2. |[0/1]| Day
      * |[ ]| ORFP to 5C
 3. |[0/1]| Swing
      * |[ ]| ORFP to 5C


      1.5 2015-02-21 Sat

 1. |[0/1]| Owl
      * |[ ]| ORFP to 5C
 2. |[0/7]| Day
      * |[ ]| MO/Pathlength evaluation and decision
      * |[ ]| Adjust MO frequency or not
      * |[ ]| 1-pass beam to BSY dump
      * |[ ]| Go CW!
      * |[ ]| Inj. Optimization with 1-pass beam
      * |[ ]| Bunch length measurement in NL/ARC1
      * |[ ]| Bunch length measurement at Inj. Spectrometer Dump
 3. |[0/1]| Swing
      * |[ ]| E[1..A,5C] emittance/TWISS measurements
          o match calculated offine.


      1.6 2015-02-22 Sun

 1. |[0/5]| Owl
      * |[ ]| E[1..A,5C] emittance/TWISS measurements
          o match calculated offine.
      * |[ ]| Magnetic 5-pass extraction to 1C dumplet
      * |[ ]| 1C (5-pass) emittance/TWISS measurement
      * |[ ]| Magnetic (or RF) 1-pass extraction to 2C dumplet
      * |[ ]| 2C (1-pass) emittance/TWISS
 2. |[0/3]| Day
      * |[ ]| Skew search (part of ATlis: 14931
        <http://opsweb.acc.jlab.org/CSUEApps/atlis/task/14931>)
      * |[ ]| *Load match values *
      * |[ ]| ORFP 2nd iteration
 3. |[0/1]| Swing
      * |[ ]| ORFP 2nd iteration


      1.7 2015-02-23 Mon

 1. |[0/1]| Owl
      * |[ ]| ORFP 2nd iteration
 2. |[0/1]| Day
      * |[ ]| Auto-quad test, beam to 1R (Joyce, 4h)
      * |[X]| ORFP 2nd iteration
 3. |[0/1]| Swing
      * |[X]| ORFP 2nd iteration


      1.8 2015-02-24 Tue

 1. |[0/1]| Owl
      * |[ ]| RTI
 2. |[0/2]| Day
      * |[ ]| Maintenance
          o |[ ]| Installed repaired Hall-B laser amplifier(8h)
          o |[ ]| 1L22-8 LLRF Tuning issues 3321143
            <https://logbooks.jlab.org/entry/3321143>
          o |[ ]| West Arc Power Loop configuration (4h)
          o |[ ]| Resurrect 1L05
      * |[ ]| 2pm lock up Hall-A and B, DCpower magnet string test
 3. |[0/1]| Swing
      * |[ ]| Recover INJ
      * |[ ]| RTI Commissioning (tentative)


      1.9 2015-02-25 Wed

 1. |[0/1]| Owl
      * |[ ]| RTI Commissioning (tentative)
 2. |[0/2]| Day
      * |[ ]| Three beam setup (Inj)
 3. |[0/1]| Swing
      * |[ ]| Unplanned activities

Author: Arne Freyberger

Created: 2015-02-20 Fri 08:35

Emacs <http://www.gnu.org/software/emacs/> 24.3.1 (Org 
<http://orgmode.org> mode 8.0-pre)

Validate XHTML 1.0 <http://validator.w3.org/check?uri=referer>


-- 
Arne Freyberger
Director of Accelerator Operations
Jefferson Lab
12000 Jefferson Avenue      Cell: (757) 876-6289
Postal Suite 19             Email:  freyberg at jlab.org
Newport News, VA 23606

-------------- next part --------------