[BTeam] Morning Update
Arne Freyberger
freyberg at jlab.org
Mon Feb 16 07:41:14 EST 2015
Beam is minutes away from the BSY dump. Probably a few issues to fight
through to get to CW OPS. But expect to be in a position to optimized
bunching by mid morning. Tasks include:
1. Optimizing bunching via 0L04 phase (Tief, Kazimi?, Spata?)
2. bunch length measurement via Arc1 (Tief/Mahmoud)
3. calibrate Arc1 SLM
4. energy spread measurement via Arc1 SLM
5. Setup for RTI commissioning
6. Prepare for the weather event
Spring 2015 Startup Evolution
1 Spring 2015 StartUp OPS
1.1 Spreadsheet
* Run Spread Sheet
<https://docs.google.com/spreadsheets/d/1AMVnjOjYZAqxLSQI_bzgt4cbmZlRY0DIh6uUaYCadPk/pubhtml>
* Please send me your gmail address if you wish to have edit privileges
1.2 |[0/7]| Deferred tasks - DEFERRED not FORGOTTEN!
* |[ ]| Calibrate INJ sync light monitor (Freyberger)
o *deferred until after Inj. SLM is aligned (Tuesday DAY)*
* |[ ]| Inj. Energy spread via Inj SLM (Freyberger)
o *deferred until after Inj. SLM is aligned (Tuesday DAY)*
* |[ ]| Repeat Energy Spread measurement at Spectrometer dump
o *deferred*
* |[ ]| re-measure Injector Emittance/TWISS
o *defer to after 0L04 phasing*
* |[ ]| Measure Inj. Chicane M56 (Krafft)
o *defer until ???*
* |[ ]| Arc1 M56 = 0
o *deferred to later*
* |[ ]| 2E emittance/TWISS measurement
o Match calculated offline, to be loaded Tuesday Day shift
o *deferred to later*
1.3 2015-02-15 Sun
1. |[3/3]| Swing
* |[X]| SL phasing
* |[X]| Beam to 2R
* |[X]| ORFP
1.4 2015-02-16 Mon
1. |[3/6]| Owl
* |[X]| Beam to 2R
o Had difficulty making the gradient, ran Fudge to its limits.
Had to re-Lem with an adjusted energy target. RF Gradient
calibration issue?
o elog: 3320760 <https://logbooks.jlab.org/entry/3320760>
* |[X]| ORFP
* |[ ]| Arc1 M56 = 0
o *deferred to later*
* |[ ]| 2E emittance/TWISS measurement
o Match calculated offline, to be loaded Tuesday Day shift
o *deferred to later*
* |[ ]| Extract 1-pass to BSY dump
o attempted but had configuration issues.
o Issue identified and extraction will be first thing on Day
shift.
* |[X]| Optimize Inj. bunching/phasing(0L04)- First Look
o elog: 3320766 <https://logbooks.jlab.org/entry/3320766>
3320768 <https://logbooks.jlab.org/entry/3320768> 3320769
<https://logbooks.jlab.org/entry/3320769> 3320770
<https://logbooks.jlab.org/entry/3320770>
2. |[0/6]| Day
* |[ ]| 1-pass to BSY dump
* |[ ]| Go CW!
* |[ ]| Optimize Inj. bunching/phasing(0L04)
o Kazimi
o Tief
o Ahmad Mahmoud
* |[ ]| Bunch length measurement via Inj SLM
o *deferred until after Inj SLM aligned*
* |[ ]| Bunch length measurement via Arc1 SLM
* |[ ]| Energy Spread via Inj and Arc1 SLM
3. |[0/3]| Swing - BS
* |[ ]| CW 1-pass to BSY Dump
* |[ ]| RTI test at 2GeV, 125MHz rep. rate.
o 50μ A avg. beam current
o 125MHz rep.rate
o bunch charge equivalent to 200μ A at 499MHz repetition rate
* |[ ]| or lower machine to 1GeV per pass
o 100μ A avg. beam current
o 249.5MHz repetition rate
o bunch charge equivalent to 200μ A at 499MHz repetition rate
1.5 2015-02-17 Tue
1. |[0/4]| Day
* |[ ]| *Punch list, limited access AM & PM?*
o |[ ]| FML Power Loop Config (4h) (West Arc Mag off)
o |[ ]| Hall-B Laser (8h)
o |[ ]| Inj sync light camera (1h)
o |[ ]| NL05 Resurrection (?h)
o |[ ]| Arc6 Water Flow
* |[ ]| restore CEBAF to configuration energy
* |[ ]| load 1E and 2E match
* |[ ]| beam back to 2R
Author: Arne Freyberger
Created: 2015-02-16 Mon 07:35
Emacs <http://www.gnu.org/software/emacs/> 24.3.1 (Org
<http://orgmode.org> mode 8.0-pre)
Validate XHTML 1.0 <http://validator.w3.org/check?uri=referer>
--
Arne Freyberger
Director of Accelerator Operations
Jefferson Lab
12000 Jefferson Avenue Cell: (757) 876-6289
Postal Suite 19 Email: freyberg at jlab.org
Newport News, VA 23606
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/bteam/attachments/20150216/f8245c7b/attachment-0002.html>
More information about the BTeam
mailing list