[BTeam] Morning Update

Arne Freyberger freyberg at jlab.org
Mon Feb 16 07:41:14 EST 2015


Beam is minutes away from the BSY dump.  Probably a few issues to fight 
through to get to CW OPS.   But expect to be in a position to optimized 
bunching by mid morning.   Tasks include:

 1. Optimizing bunching via 0L04 phase (Tief, Kazimi?, Spata?)
 2. bunch length measurement via Arc1 (Tief/Mahmoud)
 3. calibrate Arc1 SLM
 4. energy spread measurement via Arc1 SLM
 5. Setup for RTI commissioning
 6. Prepare for the weather event


  Spring 2015 Startup Evolution


    1 Spring 2015 StartUp OPS


      1.1 Spreadsheet

  * Run Spread Sheet
    <https://docs.google.com/spreadsheets/d/1AMVnjOjYZAqxLSQI_bzgt4cbmZlRY0DIh6uUaYCadPk/pubhtml>

  * Please send me your gmail address if you wish to have edit privileges


      1.2 |[0/7]| Deferred tasks - DEFERRED not FORGOTTEN!

  * |[ ]| Calibrate INJ sync light monitor (Freyberger)
      o *deferred until after Inj. SLM is aligned (Tuesday DAY)*
  * |[ ]| Inj. Energy spread via Inj SLM (Freyberger)
      o *deferred until after Inj. SLM is aligned (Tuesday DAY)*
  * |[ ]| Repeat Energy Spread measurement at Spectrometer dump
      o *deferred*
  * |[ ]| re-measure Injector Emittance/TWISS
      o *defer to after 0L04 phasing*
  * |[ ]| Measure Inj. Chicane M56 (Krafft)
      o *defer until ???*
  * |[ ]| Arc1 M56 = 0
      o *deferred to later*
  * |[ ]| 2E emittance/TWISS measurement
      o Match calculated offline, to be loaded Tuesday Day shift
      o *deferred to later*


      1.3 2015-02-15 Sun

 1. |[3/3]| Swing
      * |[X]| SL phasing
      * |[X]| Beam to 2R
      * |[X]| ORFP


      1.4 2015-02-16 Mon

 1. |[3/6]| Owl
      * |[X]| Beam to 2R
          o Had difficulty making the gradient, ran Fudge to its limits.
            Had to re-Lem with an adjusted energy target. RF Gradient
            calibration issue?
          o elog: 3320760 <https://logbooks.jlab.org/entry/3320760>
      * |[X]| ORFP
      * |[ ]| Arc1 M56 = 0
          o *deferred to later*
      * |[ ]| 2E emittance/TWISS measurement
          o Match calculated offline, to be loaded Tuesday Day shift
          o *deferred to later*
      * |[ ]| Extract 1-pass to BSY dump
          o attempted but had configuration issues.
          o Issue identified and extraction will be first thing on Day
            shift.
      * |[X]| Optimize Inj. bunching/phasing(0L04)- First Look
          o elog: 3320766 <https://logbooks.jlab.org/entry/3320766>
            3320768 <https://logbooks.jlab.org/entry/3320768> 3320769
            <https://logbooks.jlab.org/entry/3320769> 3320770
            <https://logbooks.jlab.org/entry/3320770>
 2. |[0/6]| Day
      * |[ ]| 1-pass to BSY dump
      * |[ ]| Go CW!
      * |[ ]| Optimize Inj. bunching/phasing(0L04)
          o Kazimi
          o Tief
          o Ahmad Mahmoud
      * |[ ]| Bunch length measurement via Inj SLM
          o *deferred until after Inj SLM aligned*
      * |[ ]| Bunch length measurement via Arc1 SLM
      * |[ ]| Energy Spread via Inj and Arc1 SLM
 3. |[0/3]| Swing - BS
      * |[ ]| CW 1-pass to BSY Dump
      * |[ ]| RTI test at 2GeV, 125MHz rep. rate.
          o 50μ A avg. beam current
          o 125MHz rep.rate
          o bunch charge equivalent to 200μ A at 499MHz repetition rate
      * |[ ]| or lower machine to 1GeV per pass
          o 100μ A avg. beam current
          o 249.5MHz repetition rate
          o bunch charge equivalent to 200μ A at 499MHz repetition rate


      1.5 2015-02-17 Tue

 1. |[0/4]| Day
      * |[ ]| *Punch list, limited access AM & PM?*
          o |[ ]| FML Power Loop Config (4h) (West Arc Mag off)
          o |[ ]| Hall-B Laser (8h)
          o |[ ]| Inj sync light camera (1h)
          o |[ ]| NL05 Resurrection (?h)
          o |[ ]| Arc6 Water Flow
      * |[ ]| restore CEBAF to configuration energy
      * |[ ]| load 1E and 2E match
      * |[ ]| beam back to 2R

Author: Arne Freyberger

Created: 2015-02-16 Mon 07:35

Emacs <http://www.gnu.org/software/emacs/> 24.3.1 (Org 
<http://orgmode.org> mode 8.0-pre)

Validate XHTML 1.0 <http://validator.w3.org/check?uri=referer>


-- 
Arne Freyberger
Director of Accelerator Operations
Jefferson Lab
12000 Jefferson Avenue      Cell: (757) 876-6289
Postal Suite 19             Email:  freyberg at jlab.org
Newport News, VA 23606

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/bteam/attachments/20150216/f8245c7b/attachment-0002.html>


More information about the BTeam mailing list