[BTeam] Morning Update

Arne Freyberger freyberg at jlab.org
Sun Feb 15 08:48:26 EST 2015


Apparently if one tried to send an elog entry to "bteam at jlab.org" via 
the email feature,  not only does the email *NOT* go out, but the elog 
is not made either.   So yesterday's Evening Update is lost in the ether.

More or less on track.   NL mostly phased.   About to try injector 
match.   Measure M56 in injection chicane once beam is to 1R, followed 
by 1E emittance/TWISS measurements.   See Sunday's plan below.

Arne


  Spring 2015 Startup Evolution


    1 Spring 2015 StartUp OPS


      1.1 2015-02-14 Sat

 1. |[4/4]| Owl
      * |[X]| Soak RF/Mag at design settings
      * |[X]| beam to inline dump (OPS)
          o elog: 3320475 <https://logbooks.jlab.org/entry/3320475>
            3320477 <https://logbooks.jlab.org/entry/3320477>
      * |[X]| Commission INJ sync light monitor (Freeman)
          o elog: 3320505 <https://logbooks.jlab.org/entry/3320505>
      * |[X]| CW Inline dump dwell and drift study (10 μ A CW
      * CHL1 tripped off
 2. |[6/8]| Day
      * |[X]| Resolve NL PSS/RF issues
      * |[X]| Soak RF/Mag at design settings
      * |[X]| Commission INJ sync light monitor (Freeman/Freyberger)
          o *Need to move camera down 5-7mm. Tuesday?*
          o Until camera is moved, beam has to be moved up in order to
            see it on the SLM camera.
          o elogs: 3320518 <https://logbooks.jlab.org/entry/3320518>
            3320516 <https://logbooks.jlab.org/entry/3320516>
      * |[X]| *10am* Mott A/D laser phasing (Grames/Riad)
          o elog: 3320570 <https://logbooks.jlab.org/entry/3320570>
      * |[X]| 6.3MeV/c emittance measurements (Grames)
          o elog: 3320537 <https://logbooks.jlab.org/entry/3320537>
      * |[X]| Set Inj Chicane M56=-24cm
      * |[ ]| Calibrate INJ sync light monitor (Freyberger)
          o deferred until after Inj. SLM is aligned (Tuesday DAY)
      * |[ ]| Inj. Energy spread via Inj SLM (Freyberger)
          o deferred until after Inj. SLM is aligned (Tuesday DAY)
 3. |[5/6]| Swing
      * |[X]| Resolve NL PSS/RF issues
      * |[X]| Soak RF/Mag at design settings
      * |[X]| emittance measurements in Injector chicane
        (Hofler/Kazimi/Freyberger/Spata)
          o |[X]| Horizontal 3320582
            <https://logbooks.jlab.org/entry/3320582> 3320581
            <https://logbooks.jlab.org/entry/3320581> 3320585
            <https://logbooks.jlab.org/entry/3320585>
          o |[X]| Vertical 3320590
            <https://logbooks.jlab.org/entry/3320590> 3320594
            <https://logbooks.jlab.org/entry/3320594>
          o |[X]| Calculate Match 3320677
            <https://logbooks.jlab.org/entry/3320677> 3320681
            <https://logbooks.jlab.org/entry/3320681>
      * |[X]| Beam to Spectrometer
      * |[X]| Bunch length measurements via back phasing (reference ATlis:
         1.

         2. elogs: 3320601 <https://logbooks.jlab.org/entry/3320601>
            3320603 <https://logbooks.jlab.org/entry/3320603> 3320635
            <https://logbooks.jlab.org/entry/3320635>
      * |[ ]| Repeat Energy Spread measurement at Spectrometer dump


      1.2 2015-02-15 Sun

 1. |[4/4]| Owl
      * |[X]| Soak RF/Mag at design settings
      * |[X]| Back to inline dump
      * |[X]| Beam to 1R
      * |[X]| NL phasing
 2. |[0/7]| Day
      * |[ ]| NL phasing
      * |[ ]| Load in Injector Match values
      * |[ ]| Measure Injector Emittance/TWISS
      * |[ ]| restore beam to 1R
      * |[ ]| Measure Inj. Chicane M56 (Krafft)
      * |[ ]| ORFP
      * |[ ]| 1E emittance/TWISS measurements (Tief?/Spata?)
          o Match calculated offline, to be loaded Tuesday Day shift
 3. |[0/3]| Swing
      * |[ ]| SL phasing
      * |[ ]| Beam to 2R
      * |[ ]| ORFP


      1.3 2015-02-17 Tue

 1. |[0/4]| Day
      * |[ ]| *Punch list, limited access AM & PM?*
          o |[ ]| FML Power Loop Config (4h) (West Arc Mag off)
          o |[ ]| Hall-B Laser (8h)
          o |[ ]| Inj sync light camera (1h)
          o |[ ]| NL05 Resurrection (?h)
          o |[ ]| Arc6 Water Flow
      * |[ ]| restore CEBAF to configuration energy
      * |[ ]| load 1E and 2E match
      * |[ ]| beam back to 2R

Author: Arne Freyberger

Created: 2015-02-15 Sun 08:44

Emacs <http://www.gnu.org/software/emacs/> 24.3.1 (Org 
<http://orgmode.org> mode 8.0-pre)

Validate XHTML 1.0 <http://validator.w3.org/check?uri=referer>

-- 
Arne Freyberger
Director of Accelerator Operations
Jefferson Lab
12000 Jefferson Avenue      Cell: (757) 876-6289
Postal Suite 19             Email:  freyberg at jlab.org
Newport News, VA 23606

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/bteam/attachments/20150215/405aa9e4/attachment-0002.html>


More information about the BTeam mailing list