[BTeam] It has been a pleasure to serve as my own deputy!

Arne Freyberger freyberg at jlab.org
Wed Feb 25 09:48:08 EST 2015


The weather forecast will likely change the plan for Thursday 
Owl/Day/Swing and Friday Owl.    JLAB weather team is meeting at 3:30pm, 
look for an update from Lab management after the 3:30pm meeting on Lab 
official status  and look for red readme entries in the elog  for the 
impact on CEBAF Operations.

At 1:30pm scheduling meeting today, I hand the PD phone to Tomasz 
Plawski.   It will be a pleasure to support him as the next PD.
Arne


  Spring 2015 Startup Evolution


    1 Spring 2015 Startup OPS


      1.1 2015-02-24 Tue

 1. |[3/3]| Day
      * |[X]| Change CUE password
      * |[X]| Maintenance start at 9am
          o |[X]| West Arc Power Loop configuration (4h)
          o |[X]| Resurrect 1L05 (instantaneous)
          o |[X]| 1L22-8 LLRF Tuning issues 3321143
            <https://logbooks.jlab.org/entry/3321143>
          o |[X]| Replace failed B laser amplifier (4-6h)
          o |[X]| insertable software no beam tests
          o |[X]| Replace IHA1C07 A&B motors
      * |[X]| 2pm lock up Hall-A and B, DCpower magnet string test
 2. |[2/3]| Swing
      * |[X]| Recover CEBAF
      * |[X]| ORFP to 5C dumplet
      * |[ ]| Continue 1.5.1 <#Quad-scan>
          o did not happen ORFP has not converged


      1.2 2015-02-25 Wed

 1. |[1/1]| Owl
      * |[X]| ORFP to 5C dumplet
          o 4-passes complete, 1.5passes remain
 2. |[0/2]| Day
      * |[ ]| ORFP to 5C dumplet
      * |[ ]| 750MHz beam commissioning: First Look
 3. |[0/1]| Swing
      * |[ ]| 750MHz beam commissioning: First Look
      * |[ ]| one-pass CW to BSY dump
      * |[ ]| RTI Commissioning


      1.3 2015-02-26 Thu

 1. |[0/2]| Owl
      * |[ ]| one-pass CW to BSY dump
      * |[ ]| RTI Commissioning
 2. |[0/2]| Day
      * |[ ]| RTI Commissioning until Inj group starts
      * |[ ]| Three beam setup: Injector
 3. |[0/2]| Swing
      * |[ ]| Three beam setup: Injector
      * |[ ]| Three beam setup: Hall Dumplets


      1.4 2015-02-27 Fri

 1. |[/]| Owl
      * |[ ]| ORFP to 5C dumplet
 2. |[/]| Day
      * |[ ]| Quad-scans
 3. Swing
      * |[ ]| Quad-scans


      1.5 Spreadsheet

  * Run Spread Sheet
    <https://docs.google.com/spreadsheets/d/1AMVnjOjYZAqxLSQI_bzgt4cbmZlRY0DIh6uUaYCadPk/pubhtml>

  * Please send me your gmail address if you wish to have edit privileges

 1. Emittance list
     1. |[2/2]| Inj emittance/TWISS measurements

        |[X]| INJ X file
            IHA0L07_x_APF.xml
              * elogs: 3321686 <https://logbooks.jlab.org/entry/3321686>
                3321687 <https://logbooks.jlab.org/entry/3321687>
                3321688 <https://logbooks.jlab.org/entry/3321688>
        |[X]| INJ Y file
            IHA0L07_y_AH.xml
              * elogs: 3321689 <https://logbooks.jlab.org/entry/3321689>
                3321690 <https://logbooks.jlab.org/entry/3321690>

     2. |[2/2]| 1E emittance/TWISS measurements

        |[X]| 1E X file
            IHA1E03-x.xml
              * elogs: 3321709 <https://logbooks.jlab.org/entry/3321709>
                3321709 <https://logbooks.jlab.org/entry/3321709>
        |[X]| 1E Y file
            IHA1E03-y.xml 

     3. |[2/2]| *2E* emittance/TWISS measurements

        |[X]| 2E X file
            IHA2E01-x-broad.xml 
        |[X]| 2E Y file
            IHA2E01-y-broad.xml 

     4. |[2/2]| *3E* emittance/TWISS measurements

        |[X]| 3E X file
            IHA3E01-x-broad.xml 
        |[X]| 3E Y file
            IHA3E01-y-broad.xml 

     5. |[2/2]| *4E* emittance/TWISS measurements

        |[X]| 4E X file
            IHA4E01-x-broad.xml 
        |[X]| 4E Y file
            IHA4E01-y-broad.xml 

     6. |[2/2]| *5E* emittance/TWISS measurements

        |[X]| 5E X file
            IHA5E01-x-broad.xml 
        |[X]| 5E Y file
            IHA5E01-y-broad.xml 

     7. |[2/2]| *6E* emittance/TWISS measurements

        |[X]| 6E X file
            IHA6E01-x-broad.xml 
        |[X]| 6E Y file
            IHA6E01-y-broad.xml 

     8. |[2/2]| *8E* emittance/TWISS measurements

        |[X]| 8E X file
            IHA8E01-x-broad.xml 
        |[X]| 8E Y file
            IHA8E01-y-broad.xml 

     9. |[2/2]| *9E* emittance/TWISS measurements

        |[X]| 9E X file
            IHA9E01-x-broad.xml 
        |[X]| 9E Y file
            IHA9E01-y-broad.xml 

    10. |[0/2]| *AE* emittance/TWISS measurements

        |[ ]| AE X file
            IHAAE01-x-broad.xml 
        |[ ]| AE Y file
            IHAAE01-y-broad.xml 

    11. |[0/2]| *5C* emittance/TWISS measurements

        |[ ]| 5C X file
            IHA5C00-x-broad.xml 
        |[ ]| 5C Y file
            IHA5C00-y-broad.xml 

    12. |[0/2]| *1C* emittance/TWISS measurements

        |[ ]| 1C X file
            IHA1C05-x-broad.xml 
        |[ ]| 1C Y file
            IHA1C05-y-broad.xml 

    13. |[0/2]| *2C* emittance/TWISS measurements

        |[ ]| 2C X file
            IHA2C04-x-broad.xml 
        |[ ]| 2C Y file
            IHA2C04-y-broad.xml 


      1.6 Maintenance Tasks

 1. |[0/7]| Scheduled
      * |[ ]| West Arc Power Loop configuration (4h)
      * |[ ]| Resurrect 1L05 (instantaneous)
      * |[ ]| 1L22-8 LLRF Tuning issues 3321143
        <https://logbooks.jlab.org/entry/3321143>
      * |[ ]| Replace failed B laser amplifier (4-6h)
      * |[ ]| Replace IHA1C07 A&B motors
      * |[ ]| insertable software no beam tests
      * |[ ]| 750MHz power test
 2. |[0/1]| On hold
      * |[ ]| Replace Inj sync. camera
 3. |[4/4]| Completed
      * |[X]| Align INJ Sync. Light Monitor (Thursday Morning)
      * |[X]| Verify Yao cavity electronics in tunnel (Thursday Morning?)
      * |[X]| MARC6++ Water Flow–Acid Flush
      * |[X]| RSEP9A Acid flush


      1.7 Deferred tasks - DEFERRED not FORGOTTEN!

 1. |[0/6]| To be performed
      * |[ ]| 14419:
        <http://devweb.acc.jlab.org/CSUEApps/atlis/task_view.php?task_id=14419>
        Auto quad commissioning (Joyce)
          o did not happen due to Chopper-1X issue
          o *Deferred to…*
      * |[ ]| 14856
        <http://devweb.acc.jlab.org/CSUEApps/atlis/task_view.php?task_id=14856>:
        SRCC beam commissioning (Tiefenback)
      * |[ ]| 14931
        <http://devweb.acc.jlab.org/CSUEApps/atlis/task_view.php?task_id=14931>:
        Search for skew term in 2C line (Freyberger/Tiefenback)
      * |[ ]| 14539
        <http://devweb.acc.jlab.org/CSUEApps/atlis/task_view.php?task_id=14539>:
        RTI test at 2GeV, 249.5MHz rep. rate.
          o *deferred until laser amplifiers are available to support*
            *sub 250MHz rep. rate*
          o 50μ A avg. beam current
          o rep.rate < 250MHz
      * |[ ]| Inj. Energy spread via Inj SLM
          o *deferred until after Inj. SLM is aligned*
      * |[ ]| Measure Inj. Chicane M56 (Krafft)
          o *defer until Yao electronics are confirmed in the tunnel*
 2. |[5/5]| Executed
      * |[X]| Calibrate INJ sync light monitor
          o *deferred until after Inj. SLM is aligned*
      * |[X]| Repeat Energy Spread measurement at Spectrometer dump
          o *defer to after first round of ORFP and 1-pass CW beam to BSY*
      * |[X]| re-measure Injector Emittance/TWISS
          o *defer to after first round of ORFP and 1-pass CW beam to BSY*
      * |[X]| Arc1 M56 = 0
          o *deferred to later*
      * |[X]| 2E emittance/TWISS measurement
          o Match calculated offline, to be loaded Tuesday Day shift
          o *deferred to later*

Author: Arne Freyberger

Created: 2015-02-25 Wed 09:42

Emacs <http://www.gnu.org/software/emacs/> 24.3.1 (Org 
<http://orgmode.org> mode 8.0-pre)

Validate XHTML 1.0 <http://validator.w3.org/check?uri=referer>


-- 
Arne Freyberger
Director of Accelerator Operations
Jefferson Lab
12000 Jefferson Avenue      Cell: (757) 876-6289
Postal Suite 19             Email:  freyberg at jlab.org
Newport News, VA 23606

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/bteam/attachments/20150225/e93883f9/attachment-0002.html>


More information about the BTeam mailing list