[BTeam] [New Logentry] Follow-up Re: Fopt 20jul280549 results: After 5A dispersion checks and corrections
bfreeman at jlab.org
bfreeman at jlab.org
Tue Jul 28 07:45:01 EDT 2020
Logentry Text:
--
I think the Arc 1 on design FOPT looked better than what we have now:
https://logbooks.jlab.org/entry/3816778
Although Swing Crew last night backed out of half the changes I would consult optics folks about backing all the way out. One can see that the beta still rises in Arc 1, and very large DiffX in Arc1 still. We are suppressing it in 1R->2S. If we keep the 1S optics where they are we will need to back up to 2R and take a look at those DIffX is large out of 2R. Emailing this log entry to BTeam for consultation.
---
This is a plain text email for clients that cannot display HTML. The full logentry can be found online at https://logbooks.jlab.org/entry/3817363
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/bteam/attachments/20200728/42587223/attachment.html>
More information about the BTeam
mailing list