[Clas12_calcom] [EXTERNAL] Re: timelines for RGB F19-S20 ready for detector experts
L Smith
lcs1956 at me.com
Wed Aug 2 14:47:05 EDT 2023
Dear Sylvia,
It looks like an old clas12-timeline build was used for v29.22 and not the one I requested for the ECAL timing residual timelines (June 5 or later). So I cannot evaluate the timing calibration.
Cole
> On Aug 2, 2023, at 11:11 AM, silvia--- via Clas12_calcom <clas12_calcom at jlab.org> wrote:
>
> Dear all,
> after completing FTOF and RF calibration, RGB F19-S20 is ready for the
> calibration of the other subsystems. Please check the timelines at
> https://clas12mon.jlab.org/rgb/pass0/v29.22/tlsummary/ , and let me and
> Zhiwen know which runs you need to have cooked for your subsystem.
> Ideally, it would be great if you provided, when possible, a run range, so
> we can optimize the cooking for everyone.
> Thanks a lot for your support!
> Best regards,
> Silvia
>
>
> _______________________________________________
> Clas12_calcom mailing list
> Clas12_calcom at jlab.org
> https://mailman.jlab.org/mailman/listinfo/clas12_calcom
More information about the Clas12_calcom
mailing list