[Clas12_calcom] [EXTERNAL] Re: timelines for RGB F19-S20 ready for detector experts
Raffaella De Vita
Raffaella.Devita at ge.infn.it
Fri Aug 4 08:58:28 EDT 2023
Dear Silvia,
Based on the runs that were calibrated for pass1, FT calibrations would require the following runs to be processed with the full statistics and no trigger-bit filtering: 11093, 11109, 11122, 11156, 11193, 11212, 11239, 11274.
Thanks,
Raffaella
> On 2 Aug 2023, at 11:11, silvia--- via Clas12_calcom <clas12_calcom at jlab.org> wrote:
>
> Dear all,
> after completing FTOF and RF calibration, RGB F19-S20 is ready for the
> calibration of the other subsystems. Please check the timelines at
> https://clas12mon.jlab.org/rgb/pass0/v29.22/tlsummary/ , and let me and
> Zhiwen know which runs you need to have cooked for your subsystem.
> Ideally, it would be great if you provided, when possible, a run range, so
> we can optimize the cooking for everyone.
> Thanks a lot for your support!
> Best regards,
> Silvia
>
>
> _______________________________________________
> Clas12_calcom mailing list
> Clas12_calcom at jlab.org
> https://mailman.jlab.org/mailman/listinfo/clas12_calcom
>
More information about the Clas12_calcom
mailing list