[Clas12_calcom] [EXTERNAL] RGA Sp19 pass-2 release timelines available
L Smith
lcs1956 at me.com
Tue May 9 11:19:06 EDT 2023
Hi Timothy,
The trigger mask timeline affects the pizero yield and calibration, cutting the yield by 2/3 and shifting the mean several MeV closer to the physical mass. Since e- are not required for pizero reconstruction in clas12-timeline this is not unexpected, since other non-electron triggers may be dominated by inclusive pizero production, where in addition there is sub-optimal or no vertex reconstruction, which is needed for the most precise 2-gamma opening angle measurement.
The electron SF timeline is unchanged.
Cole
> On May 8, 2023, at 2:55 PM, Hayward, Timothy via Clas12_calcom <clas12_calcom at jlab.org> wrote:
>
> Hi all,
>
> The coatjava 9.0.0 RGA Sp19 timelines are now available, https://clas12mon.jlab.org/timelines/?rg=rga4 (sp19_v0.21_qa). By my eye everything looks basically identical to the 8.7.0 timeline (sp19_v0.20_qa), which is expected and desired, but I would appreciate it you could also double check your system for approval.
>
> The only obvious difference is in the HTCC, which was seen in RGB as well, and I understand is expected by Izzy because of a software change to the timelines (could you explain to me further?). I think it would be good to get these qa lines updated before the review.
>
> There is an additional timeline (sp19_v0.21_trigger_qa), with the trigger mask 0x400001 (e- in FD or pi0 in FT) available as well if that is of interest to your subsystem.
>
> Thank you everyone for your efforts; I hope we’re finally there,
> Timothy
>
> _______________________________________________
> Clas12_calcom mailing list
> Clas12_calcom at jlab.org
> https://mailman.jlab.org/mailman/listinfo/clas12_calcom
More information about the Clas12_calcom
mailing list