[Clas12_photon] FT commissioning and run plan

Marco Battaglieri battaglieri at ge.infn.it
Wed Oct 11 13:17:29 EDT 2017


Dear FTers,
here are the minutes of toda'ys meeting with homeworks for the next meeting.
Feel free to add or point out what missed.
As discussed I created a doodle
https://urldefense.proofpoint.com/v2/url?u=https-3A__beta.doodle.com_poll_tsyaq9kz7ck34npb&d=DwICaQ&c=lz9TcOasaINaaC3U7FbMev2lsutwpI4--09aP8Lu18s&r=cVGcBoL0aH8k8TAWsF2OUQLRME6Fr2Q-yDWM-WA_5zY&m=g74ZEGV0KPmeVfjiqeMhnGaKAd_xh6Y8fEtOfu_vWNc&s=sZGhawrT-gazCDOC8oDz_czfH1lhOHtwfVpVWgjWyCQ&e= 
for next Tuesday (as a template for next weeks). I started at 10:00AM 
EDT (hope it shows up right in your time zone) ending at 1:00PM.
Please express your preference*by Sunday night *so that on Monday I can 
call the meeting.
Thanks again for attending
Marco

MINUTES and HOMEWORKS
- after discussing the plan circulated last week we all agree on the 
need of a organized run plan for all activities related to the FT (from 
the HW to the shifts, tfrom the calibrations to thehigh level analysis)
- all sub-groups (MesonEx, LDM, VeryStrange and Hybrid Baryons) are 
requested to contribute to set up a full  working detector and a 
complete framework to monitor, calibrate it before to focus on high 
level-specific analyses.
- at the next meeting we'll present a draft of a detailed FT 
commissioning plan completing what already in CalCom hands
- based on the message below, we'll prepare a detailed list of duties 
and tasks for the commissioning and production runs
- provide a repository with all the relevant documents and 
documentations to make easy to get used with the FT systems
- we'll use the engineering run as a good test for documentations 
implementing the feedback in the manual/procedures for the first run
- prepare a list of histos (same as CLAS6 MONB) to check FT vitals



Marco Battaglieri wrote:
> Dear FT enthusiasts,
> as you know the commissioning of CLAS12 will happen shortly (beginning 
> of December) and after the 30 days allocated,  we'll run for several 
> months the RG-A run.
>
> Over the next month we should provide:
> - a detailed commisioning plane
> - a detailed schedule for the commisining compliant with the general 
> CLAS12 commisioning plan
> - a list of 'detector experts' and other collaborators (students? 
> postdocs?) that will be trained during the commissioning to gain 
> enough confidence with the detector
> - a detailed shift list for commisioning and RG-A run time to be sure 
> we have enough
> - a list of analysis/calibrators working off-line during 
> commisioning/run time
> It would be also very useful to check the status of:
> - tools necessary to operate, monitor, and calibrate the FT
> and define a common set to be  tested and used.
>
> In parallel we should check the status of FT GEMC/REC sw to be sure 
> that all tools are in place.
>
> We already discussed that, during regular data taking, there will be 
> only one FT expert-on-call serving the 3 subsystems and this requires 
> that experts of each sub systems will share information and details.
>
> Here is a (preliminary) list of sub-task experts/coordinators:
>
> FT-Cal
> - hardware expert: she/he knows how the detector works, how to monitor 
> and judge if it is healthy it and names of (off-site) specialists that 
> may take care of hw issues or help on the phone
> - sim/rec expert: she/he knows how the Sim/Rec code works, take care 
> of standard and exceptional (such as develop patches)  code maintenance
> - calibration coordinator: she/he coordinate the calibration effort, 
> check results of calibration team
>
> FT-Hodo
> - hardware expert
> - sim/rec expert
> - calibration coordinator
>
> FT-Trck
> - hardware expert
> - sim/rec expert
> - calibration coordinator
>
> - FT trigger expert: she/he has knowledge of the hw and sw behind the 
> trigger, collect requirements based on physics and acts as a link with 
> the trigger/daq group
> - FT data cooking expert: she/he knows the machinery requested to cook 
> a file on the farm, keep trace of the current cooking status, collect 
> the monitoring histos (or equivalent) verifying and checking  that the 
> FT information are always present in the data stream
>
> - MesonEx analysis coordinator: she/he coordinates analysis efforts 
> providing all the necessary information about the history of collected 
> data, correction/tools to be used, warnings, ... to any new data analyzer
> - VeryStrange analysis coordinator
> - LMD analysis coordinator
> - HybridBaryon analysis coordinator
> - Pentaquark analysis coordinator
>
> + list of students/postdocs or any seniors interested to FT-involved 
> analyses
>
> We should appoint a responsible for each activity in order to have a 
> well organized structure ready for data taking day-0.
> Each expert will act as link to other detector/group/experiments 
> subtasks  and should come with an estimate of resources needed to 
> manage the task.
> Please, identify among your groups, people that may lead the effort 
> and resources to accomplish the listed tasks and send it to me by *Tue 
> Oct 10 *
>
> I propose to resume the Wednesday FT meeting to define, prepare and 
> discuss  this plan in details.
> Let's start next week (*Oct 11 at 9:00 EST*) with the old timetable 
> (and discuss if we want to keep it!).
> I'll send a reminder shortly before
> Cheers
> Marco
>
>
>
>

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/clas12_photon/attachments/20171011/2241aaad/attachment.html>


More information about the Clas12_photon mailing list