[clas12_rgk] Fwd: CLAS12 scheduling for FY21 and FY22
Annalisa D'Angelo
annalisa.dangelo at roma2.infn.it
Thu Aug 29 08:28:22 EDT 2019
Dear All,
I have received the following request from Marco Battaglieri. I have
started to work on a draft that we may eventually discuss in our next
rgk meetings.
Best regards
Annalisa
-------- Messaggio Inoltrato --------
Oggetto: CLAS12 scheduling for FY21 and FY22
Data: Wed, 28 Aug 2019 09:18:53 +0200
Mittente: Marco Battaglieri <battaglieri at ge.infn.it>
Organizzazione: INFN
A: Latifa Elouadrhirs <latifa at jlab.org>, Silvia Niccolai
<silvia at jlab.org>, Sebastian Kuhn <kuhn at jlab.org>, Lamiaa El Fassi
<elfassi at jlab.org>, Will Brooks <brooksw at jlab.org>, Marco Contalbrigo
<marco.contalbrigo at fe.infn.it>, Annalisa D'Angelo
<annalisa at roma2.infn.it>, dupre <dupre at ipno.in2p3.fr>, Larry Weinstein
<weinstei at jlab.org>
CC: Stepan Stepanyan <stepanyan at jlab.org>
Dear CLAS12 Run Groups (RG) contact-persons,
as you probably know, I'm taking the Hall-B leadership starting from mid
September and one of the first topic I will be asked to discuss with the
Physics Division is the Hall-B scheduling for next years.
While the scheduling for FY20 (see Rolf's message at the beginning of
August) is almost firm (the official rescheduling will be available
soon), a proposal for FY21 and FY22 should be presented early this fall.
The scheduling is a quite complicated process that requires to take into
account many factors that include: PAC scientific rating, technical
issues, readiness of the experiments, compatibility with other halls
requests, ... and especially (your) capability of putting together as
many experiments as possible with the same run condition in order to get
the best for the CLAS12 Collaboration out of every single day of run.
I think this is a good time to start a discussion with you (and within
the RG you represent), collecting information useful for an efficient
and agreed schedule for the future years.
I'd like to have from each of you *a short document (max 4 pages)*
reporting:
- *the list of exps* you represent (including spokesperson names);
- *key-words/highlights* about the physics program of your RG (very short);
- the number of *allocated PAC days*;
- the number of *days already run* (if any);
- *run conditions* (for the remaining part) in two scenarios
(optimal/minimal) to accomplish the physics program (or a significant
fraction) of your physics program;
- any other RG/experiment that, at your knowledge, may *share the same
run conditions* of your RG;
- a detailed list of *non-standard equipment* (something more/different
than current CLAS12 set up) or specific needs of your RG;
- the *readiness of your experiment* (equipment- and DAQ/trigger-wise)
including the ERR conclusions/recommendations (if any);
- *best arguments* to motivate the allocation for FY21 and FY22 of a
certain *fraction* of the full PAC run-time considering two possible
scenarios (optimal/minimal);
- any *known issues/difficulties* related to your run conditions where
the Lab could help with;
- any short*on-beam tests* could be useful to asses the experiment
readiness and the capability to run at the desired condition (e.g. of
luminosity).
Please provide the most possible accurate and sincere information in
order to define CLAS12 RG needs and readiness: this is just one piece of
the whole picture and I need to have it as clear as possible to defend
Hall-B (our!) interests in front of JLab management.
Let me stress that we are a Collaboration and our strength resides not
only in our-own preferred experiment but especially in our capability in
taking advantage of all other CLAS12 runs to shape the physics program
we are interested in. Understanding reasons of other RGs and acting as a
whole, is the only way to make CLAS12 physics program bigger than the
algebraic sum of the different experiments!
I'd appreciate if you could draft and send me the document *by Friday
September 6th*.
Thanks in advance
Marco
ps here below is the most updated list of RG representatives I got from
PhysDiv.
Let me know if anything is changed in your RG
RG-A: L.Elouadrhirs
RG-B: S.Niccolai
RG-C: S.Khun
RG-D: L. El Fassi
RG-E: W.Brooks
RG-F: S. Khun
RG-G: W.Brooks
RG-H: M.Contalbrigo
RG-K: A. D’Angelo
RG-L: R.Dupre
RG-M: L. Weinstein
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/clas12_rgk/attachments/20190829/9c1955d1/attachment.html>
More information about the clas12_rgk
mailing list