Dear Yuri, dear All,

on behalf of RG-K we can certainly schedule a test of the SAMPA chip 
readout electronics during RG-K but we would rather do it at the end of 
RG-K, reserving for you the time you need for the electronic read-out 
swap and the test.

We do not like the idea of changing the MVT electronics twice during the 
run, because we always risk a modification of the set-up which would 
require a dedicated alignment, calibration epochs, possible cable swaps etc.

The swap back to the DREAM read-out could be done during the change to RG-E.

Would this work for you?

All the best

Annalisa

Il 10/10/23 17:44, Yuri Gotra ha scritto:
>
> Dear Annalisa,
>
> We would like to ask you about the possibility to schedule beam test 
> of SAMPA chip readout of the MVT detectors during RGK. The test is 
> fast and can be done in a short time (Sergey can provide an estimate) 
> but there is an overhead related to removal of the beam pipe to move 
> the CVT cart upstream for a few feet to change cabling, then the same 
> procedure after the test to connect back to the DREAM readout. For 
> Sergey the preferred time would be before re-start operations in 
> January as installation of the SAMPA readout could be done during the 
> break w/o wasting beam time. Please let us know. Thank you
>
-- 
================================================
Prof. Annalisa D'Angelo
Dip. Fisica, Universita' di Roma "Tor Vergata"
Istituto Nazionale di Fisica Nucleare
Sezione di Roma Tor Vergata, Rome Italy
email:annalisa.dangelo at roma2.infn.it  
Jefferson Laboratory, Newport News, VA USA
Email:annalisa at jlab.org
Tel: + 39 06 72594562
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/clas12_rgk/attachments/20231011/6c593794/attachment.html>


More information about the clas12_rgk mailing list