[Clas12_rich] RICH installation

Bob Miller rmiller at jlab.org
Fri Jul 15 10:42:21 EDT 2016


Hi Marco,

Bolting to the floor in the clean room and the Hall is approved. We do 
this on a regular basis.  Our work coordinator, Doug Tilles, will 
oversee the work to make sure it is done properly.

Thanks,

Bob


On 7/14/2016 6:57 PM, Marco Mirazita wrote:
> Hi Bob,
> we discussed many times during our meetings about the platforms and 
> the bolts that fix the RICH assembly structure to the floor, both in 
> the clean room and in the experimental Hall.
> However, I'm not sure if we can consider also this detail as approved 
> or we need to take additional actions to have the formal approval.
> Could you please clarify this aspect?
> Thanks,
> Marco
>
>
>
> Il 2016-05-16 21:25 Bob Miller ha scritto:
>> Hi Marco,
>>
>> Saptarshi reviewed the design after your last meeting and I reviewed
>> it with him last week, but somehow the information was not passed on
>> to your team.  However, the design looks great, the mounts fit our
>> strong back and there is no interference, so please go ahead with the
>> construction of the parts.
>>
>> Thanks,
>> Bob
>>
>> On 5/13/2016 1:14 PM, Marco Mirazita wrote:
>>> Dear Bob,
>>> I'm sending you this again in case you have missed it.
>>> Could you please let me know?
>>> Thank you,
>>> Marco
>>>
>>>
>>> Il 2016-05-11 17:57 Marco Mirazita ha scritto:
>>>> Dear Bob,
>>>> during our last meeting, we presented our solution for the attaching
>>>> elements of the RICH to the Beam Pipe and to install it using the same
>>>> strong-back used for the LTCC.
>>>> We have now the necessity to start as soon as possible the
>>>> construction of these last pieces, but before doing so we want wait
>>>> for your approval.
>>>> Do you think that what we proposed is fine? Can we proceed with the
>>>> construction?
>>>> If you need any further information, please don't hesitate to contact
>>>> us and, if necessary, we are available for the set up of a phone
>>>> meeting.
>>>> Thank you,
>>>> Marco

-- 
Bob Miller
Hall B Lead Engineer
Jefferson Lab
757 269-7867




More information about the Clas12_rich mailing list