[Clas12_rich] RICH installation

Marco Mirazita Marco.Mirazita at lnf.infn.it
Thu Jul 14 18:57:59 EDT 2016


Hi Bob,
we discussed many times during our meetings about the platforms and the 
bolts that fix the RICH assembly structure to the floor, both in the 
clean room and in the experimental Hall.
However, I'm not sure if we can consider also this detail as approved or 
we need to take additional actions to have the formal approval.
Could you please clarify this aspect?
Thanks,
Marco



Il 2016-05-16 21:25 Bob Miller ha scritto:
> Hi Marco,
> 
> Saptarshi reviewed the design after your last meeting and I reviewed
> it with him last week, but somehow the information was not passed on
> to your team.  However, the design looks great, the mounts fit our
> strong back and there is no interference, so please go ahead with the
> construction of the parts.
> 
> Thanks,
> Bob
> 
> On 5/13/2016 1:14 PM, Marco Mirazita wrote:
>> Dear Bob,
>> I'm sending you this again in case you have missed it.
>> Could you please let me know?
>> Thank you,
>> Marco
>> 
>> 
>> Il 2016-05-11 17:57 Marco Mirazita ha scritto:
>>> Dear Bob,
>>> during our last meeting, we presented our solution for the attaching
>>> elements of the RICH to the Beam Pipe and to install it using the 
>>> same
>>> strong-back used for the LTCC.
>>> We have now the necessity to start as soon as possible the
>>> construction of these last pieces, but before doing so we want wait
>>> for your approval.
>>> Do you think that what we proposed is fine? Can we proceed with the
>>> construction?
>>> If you need any further information, please don't hesitate to contact
>>> us and, if necessary, we are available for the set up of a phone
>>> meeting.
>>> Thank you,
>>> Marco


More information about the Clas12_rich mailing list