[Clas12_rich] RICH assembly
Walt Akers / JLAB
akers at jlab.org
Mon Jul 25 14:07:50 EDT 2016
Marco:
I just spoke to Yuri Gotra who is working on the SVT. He is
going to provide me a working model of the SVT assembly and
test setup so that we can determine how it will co-exist in the
clean room with your work. I'll send you details when they are
available.
Walt
Stepan Stepanyan wrote:
> Walt,
>
> Volker pointed out I did not put date for installation, sorry.
> Drift chambers will be installed by October.
>
> Stepan
>
> On 7/22/16 10:27 AM, Stepan Stepanyan wrote:
>> Dear Walt,
>>
>> According to our current schedule CLAS12 drift chambers that occupy
>> most of space in the
>> clean room must be installed in the hall. The only thing will be
>> remain there is SVT. SVT does
>> not take much space and it can be moved around if needed.
>>
>> Regards, Stepan
>>
>> On 7/21/16 3:58 PM, Walt Akers / JLAB wrote:
>>> Dear Volker, Stepan and Mac:
>>>
>>> As Marco mentions below, we are approaching the time for the
>>> RICH detector work to begin in EEL 124. I've included an excerpt
>>> from the work plan here.
>>>
>>> *RICH detector assembly October 2016 to July 2017*
>>> The assembly of the detector will begin in the EEL-124 clean
>>> room in October
>>> 2016. The project team has requested an area of 36’ x 36’. This
>>> large area is
>>> required also to perform the alignment of the mirrors inside the
>>> detector. The area
>>> must be quipped with a 2 ton crane capacity and possibly a
>>> forklift for the
>>> movement and installation of the various components.
>>> The assembly of the RICH will be performed by using a special
>>> mechanical
>>> structure, anchored on the floor, on which the various
>>> components will be
>>> mounted. The assembly structure is equipped with a winch to
>>> rotate the RICH
>>> from the vertical assembly position to the horizontal one ready
>>> for the
>>> transportation inside the Hall B.
>>> The assembly procedures will also include the check of the
>>> alignment of the
>>> mirrors once they are installed and the survey of the RICH
>>> module. For these
>>> operations, the support of the JLab survey group is requested.
>>>
>>>
>>> Are your folks nearing completion of their work in the room and how
>>> soon might it be available for the RICH folks to begin?
>>>
>>> Thanks,
>>>
>>> Walt
>>>
>>>
>>> Marco Mirazita wrote:
>>>> Dear Walt,
>>>> even if with some delay, the construction of the RICH is almost
>>>> done and we should be able to ship by sea during this summer.
>>>> It means that most likely in September all the material should be
>>>> stored in the CMSA.
>>>> According to the last RICH installation plan we discussed, the
>>>> assembly work should start in October. Could you please confirm
>>>> that the area we need in the EEL124 clean room will be made free?
>>>> Thanks,
>>>> Marco
>>>>
>>>
>>
>
More information about the Clas12_rich
mailing list