[clas_members] Hall B meeting
Volker Burkert
burkert at jlab.org
Mon Jul 18 13:41:06 EDT 2011
Dear Colleagues,
since you probably cannot get a link to the JLab web page, I copied
the minutes of the meeting to this text file.
Best regards,
Volker Burkert
Hall B Group Meeting Minutes: July 18, 2011
You can view this document and the minutes of previous meetings on the
web at http://clasweb.jlab.org/group_meeting_minutes/Physics/
------------------------------------------------------------------------
*Present:* Gegham Asryan, Harut Avakian, Vitaly Baturin, Volker Burkert
(chair), Daniel Carman, Annalisa D'Angelo, John Domingo, Latifa
Elouadrhiri, Francois-Xavier Girod, Javier Gomez, Tsueneo Kageya, Dave
Kashy, Puneet Khetarpal, Alex Kubarovsky, Valery Kubarovsky, Bert
Manzlak, Jeff Mazurek, Mac Mestayer, Taisiya Mineeva, Victor Mokeev,
Bogdan Niczyporuk, Kijun Park, Eugene Pasyuk, Sergey Pozdnyakov, Yelena
Prok, Andrew Sandorfi, Youri Sharabian, Stepan Stepanyan, Doug Tilles,
Maurizio Ungaro, Hakob Voskanyan, Xiangdong Wei, Dennis Weygand
Announcements
* Over the past two weeks the JLab IT Division has been dealing with
a cyber-event. Services and access should now be fully restored.
Contact the JLab Help Desk if you have questions, find a problem,
or need assistance.
Environment, Health, and Safety Issues
* Due to some minor flooding in the accelerator from the significant
rainfall of a few weeks ago, there was a slip and fall accident.
New lab policy is that no work is allowed in areas with standing
water until the water problem is dealt with and clean up has been
completed.
* For students visiting JLab for work this summer, please make sure
that they receive all required training. Also be sure that they
are given a safety walkthrough of the areas in which they will be
working.
* There is a lot of activity in Hall B during the shutdown. All work
in Hall B must be coordinated through the Hall B work coordinator
Doug Tilles. If Doug is not available, then contact the associate
work coordinator Denny Insley.
* The most relevant location for JLab safety documentation is the
JLab ESH&Q web page
<https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-2511>.
All staff, contractors, and users are responsible for the material
in this manual.
* The HBLis <http://devweb.acc.jlab.org/CSUEApps/batlist/atlis.php>
protocol should be used for all Hall B related work that requires
personal protective equipment, man lift use, crane work, and any
work that involves an OSP or TOSP. If there are any questions on
the use of this form, please contact Doug Tilles. A list of all
JLab work list is included on the JLab listsites
<http://www.jlab.org/listsites/> web page.
PAC38
* The technical reviews of the proposals submitted for PAC38 are now
underway. The review committee will be meeting this week to
finalize their findings.
* Several proposals with more technically challenging proposals have
been set aside for a more detailed independent review.
Conference Reports
* Victor Mokeev gave the first of two reports on details regarding
nucleon resonance spectroscopy from the recent HADRON2011
conference in Germany. Please see his review slides
<http://clasweb.jlab.org/group_meeting_minutes/Physics/talks_2011/mokeev_7_18.pdf>
if you are interested.
Hall B Work
* Work on the drift chamber repairs remains in progress. Presently
repairs on three sectors have been completed.
* The electrical work that has been ongoing on the Space Frame
associated with the 12 GeV upgrade has been completed.
HD-Ice Progress
* The In-Beam Cryostat (IBC) has been fully reassembled and cool
down began last week. Presently the system is at about 6 K. The
cooling timeline in the HD-Ice Lab is a bit longer than in Hall B
as the liquid helium supply is just a fraction of what is
available in the direct connection in the hall. Presently the work
on the target is reasonably on schedule. The plan is to move the
target back to Hall B starting at the end of August.
12-GeV Update
* Some brief updates were provided today:
o PCAL: the stacking of the first module has been completed.
The plan is to close the box this week and then to glue the
fibers into their holders and then to begin polishing. The
schedule has the stacking of the second module beginning at
the end of August.
o FTOF (panel-1b): USC has now received 90 PMT assemblies with
another 43 to be delivered this week. Testing is in
progress. The prototype backing structures were tested
successfully and the testing report is being finalized.
There will be communication with Astro Machine this week to
begin preparations of the production units. The first
production shipment of scintillation bars is on target for
delivery within the next two or three weeks.
o CTOF: Procurement preparations are underway for the
downstream PMTs and light guides. Recent design work has
made good progress in resolving space issues between the
CTOF, the neutron detector, and the central tracker.
o DC: Stringing of Region 2 chambers continues at Old Dominion
University. The first carbon-fiber shell for Region 3 has
been ordered. The Region 1 sector being strung at JLab is
about half done. The readiness review for Region 1 stringing
at Idaho State University is scheduled for Aug. 18 and
working on preparing their clean room is underway.
o Magnets: Dave Kashy and Lionel Quettier have been spending
significant time at WANG NMR, the vendor of the CLAS12 torus
and solenoid magnets. There has been good progress in
winding the prototype torus coil with many of the final
techniques developed and honed. There has also been good
progress on the design of the solenoid coil support structure.
* There will be a series of Hall B presentations focussing on
progress and plans for the different subsystems of the CLAS12
detector that will take place through the fall.
o Youri Sharabian gave a presentation reviewing details of the
HTCC design and construction status. If you are interested,
please see his slides
<http://clasweb.jlab.org/group_meeting_minutes/Physics/talks_2011/youri_7_18.ppt>.
------------------------------------------------------------------------
Recorded by Daniel S. Carman <mailto:carman at jlab.org>.
More information about the clas_members
mailing list