[dsg-eic_dirc] DIRC laser safety document
Beni Zihlmann
zihlmann at jlab.org
Tue Dec 13 16:32:14 EST 2022
Regarding the "Visitor, Spectator" section, what is the purpose of such?
I guess Greg can answer that. Depending on the answer the laser may not
be needed to operate
in that scenario.??
cheers,
Beni
On 12/13/22 16:19, Jennifer Williams via dsg-eic_dirc wrote:
> Hi Marc,
> I have a few questions/comments for the documents.
>
> I tracked changes and made comments in the margins.
>
> Please let me know if you have any questions.
>
> Thanks
> Jen
> ------------------------------------------------------------------------
> *From:* dsg-eic_dirc <dsg-eic_dirc-bounces at jlab.org> on behalf of Marc
> Mcmullen via dsg-eic_dirc <dsg-eic_dirc at jlab.org>
> *Sent:* Monday, December 12, 2022 4:12 PM
> *To:* Tyler Lemon <tlemon at jlab.org>; dsg-eic_dirc at jlab.org
> <dsg-eic_dirc at jlab.org>
> *Cc:* Patrizia Rossi <rossi at jlab.org>
> *Subject:* Re: [dsg-eic_dirc] DIRC laser safety document
> Thanks Tyler, I'll go through the documents and make the appropriate
> changes.
>
> Marc
>
> ------------------------------------------------------------------------
> *From:* Tyler Lemon <tlemon at jlab.org>
> *Sent:* Monday, December 12, 2022 3:39 PM
> *To:* dsg-eic_dirc at jlab.org <dsg-eic_dirc at jlab.org>; Marc Mcmullen
> <mcmullen at jlab.org>
> *Cc:* Patrizia Rossi <rossi at jlab.org>
> *Subject:* Re: DIRC laser safety document
> Hi Marc,
>
> I've looked over both documents and have some comments and questions:
>
> _General_
> - In both documents, the laser manufacturer is named as "Kimmon". On
> the laser documentation, the manufacturer is listed as "Kimmon Koha".
> It may not be important, but I thought I'd mention it.
>
> _Laser System Specific Lesson plan document:_
> - Page 1: under "4.0 Target Audience", the room number is incorrect in
> the text box that says "Workers need to work in the EEL 102A laser room"
>
> - Page 1: under "7.0 Aids/Handouts" for the text box #2, the contents
> look incomplete or cutoff. All I can see in that box is "Brief
> Description: laser system for"
>
> - Page 2: under Objective A, SoB A.3, the eye protection is noted as
> 7+ OD. Should this be changed to 2+ to match the LOSP?
>
> - Page 6: under SoB D.1, the low-power filter will reduce the laser
> power by a factor of 100 (document currently says 10).
>
> _Laser Operational Safety Procedure:_
> - Page 4: What is the "Laser Process" for the potential hazard
> "Temporary or permanent eye damage"? If it's "Operations", that
> process has another "Temporary or permanent eye damage" hazard row on
> page 2; could the two rows be combined?
>
> - Page 8: It says "The laser housing is mounted on a stage." From the
> diagram and from what we've talked about, I thought the laser housing
> is on a fixed height stand. In the diagram also on page 8, it looks
> like the laser housing is sitting on extruded aluminum.
>
> - Page 9: under "Hazards" there is "(2+)" after any time it says
> "laser eye protection". Making it say "(OD 2+)" might make it clearer
> that the glasses need to be rated correctly and avoid the chance of
> any misunderstandings as to what 2+ means
>
>
> -Tyler
> ------------------------------------------------------------------------
> *From:* dsg-eic_dirc <dsg-eic_dirc-bounces at jlab.org> on behalf of Marc
> Mcmullen via dsg-eic_dirc <dsg-eic_dirc at jlab.org>
> *Sent:* Monday, December 12, 2022 10:31 AM
> *To:* dsg-eic_dirc at jlab.org <dsg-eic_dirc at jlab.org>
> *Cc:* Patrizia Rossi <rossi at jlab.org>
> *Subject:* [dsg-eic_dirc] DIRC laser safety document
> Hi Beni and Greg,
>
> Attached is the latest update to the LOSP/THA document. I have made
> some changes to the procedure section and included the Maximum
> Permissible Exposure information provided by Jen Williams. The
> procedure section changes included the same details which are in the
> Laser specific lesson plan and additional text on the "sweep"
> sub-procedure.
>
> If everyone can review this by Tuesday, and send comments. I can make
> those changes and submit this for SME reviews. This will put the
> document on track for approval just after the return from the holiday
> break.
>
> Regards,
> Marc
>
> _______________________________________________
> dsg-eic_dirc mailing list
> dsg-eic_dirc at jlab.org
> https://mailman.jlab.org/mailman/listinfo/dsg-eic_dirc
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-eic_dirc/attachments/20221213/bdea1ff5/attachment.html>
More information about the dsg-eic_dirc
mailing list