[Dsg-eic_tracker] EIC Beamline flow test

Marc Mcmullen mcmullen at jlab.org
Tue May 2 13:23:49 EDT 2023


Hi Patrizia and Rolf,

Last week Jlab Industrial hygiene took some air quality samples after DSG installed a carbon filter on the test stand. They cleared us to continue testing.

We have resumed flow testing with the simulated beam pipe at ~100 C. The test will be run at 10, 20, 50, 100, 150, 200, and 250 lpm. We will flow at each value for 3 hours.

We will send updates of the results.


Regards,
Marc
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-eic_tracker/attachments/20230502/01eea263/attachment-0001.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: EIC beampipe temp_080223_flow testing_10lpm.JPG
Type: image/jpeg
Size: 103856 bytes
Desc: EIC beampipe temp_080223_flow testing_10lpm.JPG
URL: <https://mailman.jlab.org/pipermail/dsg-eic_tracker/attachments/20230502/01eea263/attachment-0001.jpe>


More information about the Dsg-eic_tracker mailing list