[Dsg-halla_ecal] Fw: 6 supermodule test stand controls

Marc Mcmullen mcmullen at jlab.org
Mon Apr 24 17:03:16 EDT 2023


________________________________
From: Marc Mcmullen
Sent: Monday, April 24, 2023 5:02 PM
To: dsg-halla_ecal at jlab.org <dsg-halla_ecal at jlab.org>
Subject: 6 supermodule test stand controls

Hi Bogdan, Albert, and Donald,

The controls have been installed at the test stand. We will need to do some testing. But before that happens the supermodules and aluminum bars need to be segmented so that there are 3 channels of supermodules, with two supermodules per channels (top (sm1 and 2), middle(sm3 and 4), and bottom (sm5 and 6). The aluminum bars should be two channels (left (Al1) and right (Al2)). Each channel will require power cables for connection to the Lowell AC relays.

I have spoken to Albert and Donald about this arrangement, so they are aware.

I will prepare some slides so we can discuss how the system gets connected, and how to run the controls.

Regards,
Marc
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-halla_ecal/attachments/20230424/ae502029/attachment-0001.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: 6 sm and Al.jpg
Type: image/jpeg
Size: 252756 bytes
Desc: 6 sm and Al.jpg
URL: <https://mailman.jlab.org/pipermail/dsg-halla_ecal/attachments/20230424/ae502029/attachment-0001.jpg>


More information about the Dsg-halla_ecal mailing list