[Dsg-halla_ecal] 6 supermodule test stand controls
Amrit Yegneswaran
yeg at jlab.org
Tue Apr 25 06:59:03 EDT 2023
good work marc
________________________________
From: Dsg-halla_ecal <dsg-halla_ecal-bounces at jlab.org> on behalf of Marc Mcmullen via Dsg-halla_ecal <dsg-halla_ecal at jlab.org>
Sent: Monday, April 24, 2023 5:03 PM
To: dsg-halla_ecal at jlab.org <dsg-halla_ecal at jlab.org>
Subject: [Dsg-halla_ecal] Fw: 6 supermodule test stand controls
________________________________
From: Marc Mcmullen
Sent: Monday, April 24, 2023 5:02 PM
To: dsg-halla_ecal at jlab.org <dsg-halla_ecal at jlab.org>
Subject: 6 supermodule test stand controls
Hi Bogdan, Albert, and Donald,
The controls have been installed at the test stand. We will need to do some testing. But before that happens the supermodules and aluminum bars need to be segmented so that there are 3 channels of supermodules, with two supermodules per channels (top (sm1 and 2), middle(sm3 and 4), and bottom (sm5 and 6). The aluminum bars should be two channels (left (Al1) and right (Al2)). Each channel will require power cables for connection to the Lowell AC relays.
I have spoken to Albert and Donald about this arrangement, so they are aware.
I will prepare some slides so we can discuss how the system gets connected, and how to run the controls.
Regards,
Marc
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-halla_ecal/attachments/20230425/b83a0983/attachment.html>
More information about the Dsg-halla_ecal
mailing list