[Dsg-halla_ecal] ECal controls update
Marc Mcmullen
mcmullen at jlab.org
Tue Aug 29 08:51:28 EDT 2023
Hi,
DSG has completed the latest update for the ECal controls which includes the following improvements:
* Configuration file for the PID settings
* Current monitoring for each heater channel (5 channels)
[cid:c9d6dc7a-c489-4fef-94d4-88bea41c42fc]
* Current monitoring display for the GUI
[cid:9c825458-b050-4127-9112-41d0275cb3ad]
The software is currently running as a Real-Time application on the cRIO. Should the software stop running the Watchdog software will reboot it to a safe state, with all heaters off. But the setpoints and PID settings will return.
DSG will monitor the system until it is shutdown and moved to Hall A.
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-halla_ecal/attachments/20230829/75b4a15f/attachment-0001.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image.png
Type: image/jpeg
Size: 184743 bytes
Desc: image.png
URL: <https://mailman.jlab.org/pipermail/dsg-halla_ecal/attachments/20230829/75b4a15f/attachment-0001.jpe>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: Outlook-5esmlbuh.jpg
Type: image/jpeg
Size: 437946 bytes
Desc: Outlook-5esmlbuh.jpg
URL: <https://mailman.jlab.org/pipermail/dsg-halla_ecal/attachments/20230829/75b4a15f/attachment-0001.jpg>
More information about the Dsg-halla_ecal
mailing list