Hi Marc,

Getting out by July 30 should be fine.  I'm CC'ing the GEM group
leads (Kondo and Nilanga) as well.

Baring some serious unforeseen problem (that would impact the upcoming
SBS program), all the hardware should be in the Hall by that point.

-- Brad

On Fri, 23 Apr 2021, Marc Mcmullen wrote:

> Hi Brad,
> 
> During our last meeting we discussed the timeline for the completion of the
> SBS GEM assembly.
> 
> This was brought up during the RICH meeting this morning. The RICH
> electronics assembly and testing occupies the same area that the SBS is
> currently occupying. The RICH collaboration will need to start assembling
> the electronics in that area on August 2.
> 
> Will the GEM detectors, equipment, and materials be removed by July 30?
> 
> Regards,
> Marc McMullen
> Sr. Instrumentation Designer
> Detector Support Group
> (757) 269-7738

-- 
Brad Sawatzky, PhD <brads at jlab.org>  -<>-  Jefferson Lab / Hall C / C111
Ph: 757-269-5947  -<>-  Fax: 757-269-5235  -<>- Pager: brads-page at jlab.org
The most exciting phrase to hear in science, the one that heralds new
  discoveries, is not "Eureka!" but "That's funny..."   -- Isaac Asimov


More information about the Dsg-halla_gem mailing list