[Dsg-halla_gem] Gas prototype system for GEMs in Hall A

Marc Mcmullen mcmullen at jlab.org
Wed Jun 16 15:48:15 EDT 2021


Hi Holly,

I will contact Brad to get the Raspberry Pi moved onto the Hall A subnet so that we can enable remote monitoring. I am not sure of the current status of the gas distribution system, other than it has been relocated to the Hall. But if everything is in the same condition as it was in the TEDF we should be able to resume flow and monitoring sometime next week.

Regards,
Marc McMullen
Sr. Instrumentation Designer
Detector Support Group
(757) 269-7738

From: Holly Szumila-Vance<mailto:hszumila at jlab.org>
Sent: Wednesday, June 16, 2021 11:08 AM
To: Jack Segal<mailto:segal at jlab.org>; dsg-halla_gem at jlab.org<mailto:dsg-halla_gem at jlab.org>
Cc: Jessie Butler<mailto:jbutler at jlab.org>
Subject: [Dsg-halla_gem] Gas prototype system for GEMs in Hall A

Hi all,

Would it be possible to begin setup of the gas prototype system down in Hall A so we can begin to flush the GEMs with nitrogen? I was thinking this could happen sometime next week, but I wanted to check with everyone to see if that works.

Thanks,
Holly

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-halla_gem/attachments/20210616/8886b654/attachment.html>


More information about the Dsg-halla_gem mailing list