[dsg-halla_moller] TM3 Sensor Instrumentation
Ruben Fair
fair at jlab.org
Fri Aug 29 17:36:40 EDT 2025
Thank you so much for the update Brian and thank you Mindy!
Klaus will be taking over as PM for MOLLER, so please include him in all correspondence.
Many thanks all
Ruben
Get Outlook for iOS<https://aka.ms/o0ukef>
________________________________
From: dsg-halla_moller <dsg-halla_moller-bounces at jlab.org> on behalf of Brian Eng via dsg-halla_moller <dsg-halla_moller at jlab.org>
Sent: Friday, August 29, 2025 5:04:56 PM
To: dsg-halla_moller at jlab.org <dsg-halla_moller at jlab.org>
Subject: [dsg-halla_moller] TM3 Sensor Instrumentation
Hi Eric,
Mindy has completed installation of the sensors, cables, and connectors for the vacuum side of TM3.
She has also completed 3 out of 4 production cables that go between the vacuum enclosure and PLC rack. These are the cables that will be used in the hall, but also for the magnet mapping in the test lab.
I checked the full readout chain with those cables and they all passed. I put these cables on the shelves in the test lab.
Mindy should be able to finish the final TM3 cable after the holiday break.
Thanks
Brian
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-halla_moller/attachments/20250829/3ee9a834/attachment.htm>
More information about the dsg-halla_moller
mailing list