Hello Pablo,

 I have attached a power point slide that should be an aid in showing the cryogenic layout being developed for the CLEO-II magnet.
One thing I noticed was the JT numbering scheme is off from previous spreadsheet.
Maybe put some place holders on the screen to show epic tags from ESR or cryo plant.

I will look over the drawings this week.

Thanks
Steven


________________________________
From: Dsg-halla_magnets <dsg-halla_magnets-bounces at jlab.org> on behalf of Pablo Campero Rojas <campero at jlab.org>
Sent: Friday, April 24, 2020 4:10 PM
To: dsg-halla_magnets at jlab.org <dsg-halla_magnets at jlab.org>
Cc: Patrizia Rossi <rossi at jlab.org>
Subject: [Dsg-halla_magnets] Hall A SoLID magnet controls projects' progress

Hi  Steven Lassiter,

We are progressing in the development of the soLID magnet HMI screens and the engineering drawings.
Mary Ann and I have developed the drawings A00000-16-03-2450 and A00000-16-03-1150, available at https://www.jlab.org/physics/dsg/technical_documentation/hall_a/drawings

I have also completed the first version of Cryo Reservoir HMI screen, see the attached picture.

Regards,
Pablo
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-halla_solid/attachments/20200427/fb1c3f3c/attachment-0002.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: Cleo-Figures.pptx
Type: application/vnd.openxmlformats-officedocument.presentationml.presentation
Size: 710688 bytes
Desc: Cleo-Figures.pptx
URL: <https://mailman.jlab.org/pipermail/dsg-halla_solid/attachments/20200427/fb1c3f3c/attachment-0002.pptx>


More information about the Dsg-halla_magnets mailing list