[Dsg-halla_magnets] Turret Work Update
Patrizia Rossi
rossi at jlab.org
Sat Jul 23 12:52:05 EDT 2022
Great job Brian and Mindy!
Great to see also the pictures – before and after- of this not easy work
patrizia
-------------------------------------------
# Patrizia Rossi
# Jefferson Lab
# 12000 Jefferson Avenue
# Suite 5
# Newport News VA 23606 (USA)
# e-mail: rossi at jlab.org<mailto:rossi at jlab.org>
# phone: +1 (757) 269 7740
# fax: + 1 (757) 269 5800
From: Brian Eng <beng at jlab.org>
Date: Friday, July 15, 2022 at 1:38 PM
To: dsg-halla_magnets at jlab.org <dsg-halla_magnets at jlab.org>
Cc: Patrizia Rossi <rossi at jlab.org>
Subject: Re: Turret Work Update
DSG's initial work on the turret is complete (all needed wires have been labeled, isolated, and separated); it is ready for Hall A techs to start on their work.
Attached are pictures from Mindy showing the isolated bundles, the inside the large flange with the wires free, and the small flanges with the connectors removed.
We'll work on cleaning up the connectors on the small flange while the turret work is ongoing.
________________________________
From: Brian Eng
Sent: Thursday, July 14, 2022 1:28 PM
To: dsg-halla_magnets at jlab.org <dsg-halla_magnets at jlab.org>
Subject: Turret Work Update
Mindy has finished adding labels to wires that needed additional labeling and has started the process of disconnecting the small flanges, which should be completed in the next day or so. See attached image for an example of after flange A was disconnected; it has been pulled through the tube (small hole on the right middle edge of the image) and additional heat shrink added over the bundle.
She's also found a few discrepancies between the drawing and how they flanges are actually wired. I'll send details later so it can be decided how to proceed once the reconnection work is done. Perhaps something to discuss in the meeting next week?
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-halla_solid/attachments/20220723/27f1efcb/attachment-0002.html>
More information about the Dsg-halla_magnets
mailing list