Peter, 

It's not clear what you are asking. It looks like you are pretty far along. The older version of cs-studio you are using may have compatibility issues with the latest version we are testing. But that's easy to try. 

The documentation and block diagram you doesn't really answer these things: 

Do you need a softIOC to write these PVs too or did you make one? 
Do you need the alarm handler setup? 

You still have a standing invitation to the slow controls meetings. But as Brian/George did for gas systems, you can keep us in the loop without attending. 

Wesley 

> From: "Peter Bonneau" <bonneau at jlab.org>
> To: "Wesley Moore" <wmoore at jlab.org>
> Cc: dsg-ft at jlab.org
> Sent: Monday, April 24, 2017 9:08:21 AM
> Subject: CSS GUI for Hall B FT Interlock System

> Hello Wesley,

> The Hall B FT group needs a CSS GUI for the FT Hardware Interlock System. This
> GUI would be integrated into the other FT EPICS screens.

> The FT Hardware Interlock System is an independent backup system which can
> disable the LV, HV, and FT chiller. The system can be monitored and trip
> thresholds adjusted via Labview and/or an EPICS GUI.

> DSG has completed the initial programming on the cRio for the EPICS interface.
> Located in the EEL building and configured as an EPICS server, the PV signals
> are now available via the Hall B .86 subnet. The EPICS interface has been
> tested via a CSS test GUI.

> Detailed information on the system configuration, hardware, EPICS PV signal
> names, CSS test screen .OPI file, and LabVIEW interface can be found on the FT
> Hardware Interlock System website here:

> https://userweb.jlab.org/~bonneau/FT%20Hardware%20Interlock%20System/

> Peter
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-hallb_ft/attachments/20170424/21852e77/attachment-0002.html>


More information about the Dsg-ft mailing list