Hello Wesley,
The Hall B FT group needs a CSS GUI for the FT Hardware Interlock
System. This GUI would be integrated into the other FT EPICS screens.
The FT Hardware Interlock System is an independent backup system which
can disable the LV, HV, and FT chiller. The system can be monitored and
trip thresholds adjusted via Labview and/or an EPICS GUI.
DSG has completed the initial programming on the cRio for the EPICS
interface. Located in the EEL building and configured as an EPICS
server, the PV signals are now available via the Hall B .86 subnet. The
EPICS interface has been tested via a CSS test GUI.
Detailed information on the system configuration, hardware, EPICS PV
signal names, CSS test screen .OPI file, and LabVIEW interface can be
found on the FT Hardware Interlock System website here:
https://userweb.jlab.org/~bonneau/FT%20Hardware%20Interlock%20System/
<https://userweb.jlab.org/%7Ebonneau/FT%20Hardware%20Interlock%20System/>
Peter
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-ft/attachments/20170424/cd3be06a/attachment.html>
More information about the Dsg-ft
mailing list