Hi George,
we have re-discussed the positioning of the different components of the
FTCal gas system with Bob and Morgan, who is helping us with the
installation. Their suggestion was to possibly keep everything on the
subway, pacing the rotometer close to the other ones already installed
and the bubbler in the bubbler tray with the other ones. Could we move
the flowmeter upstairs as well: I thought that was not going to be
possible but we check the cable from the cRio to the device and that
looks long enough.
If you are available we could meet to discuss it: we will be in the Hall
most of the day tomorrow working on cabling.
Best regards,
Raffaella
Raffaella De Vita wrote:
> Hi George,
> thanks for pointing out that the rotometer has to be upstream. I guess
> this was not considered when the new configuration was discussed and
> the idea of moving rotometer and bubbler on the subway was just for
> convenience. However we can go back to the original idea of having
> everything close to the compact rio. We will revisit the plan and get
> back to you on Monday.
> Regards,
> Raffaella
>
> George Jacobs wrote:
>>
>> The flow control rotameter should be upstream of the transducer if
>> your concerened with accurate transducer readback. It could be right
>> next to it, The flow control rotometer must be in the vertical
>> position. Have you discussed these changes with the DA?
>>
>> George
>>
>>
>> On 07/14/2017 02:54 PM, Raffaella De Vita wrote:
>>> Hi George,
>>> plans about the panel have changed a bit: it was decided to install
>>> rotometer and bubbler close to the detector on the subway, leaving
>>> the flowmeter close the compact rio since I believe it gets power
>>> from the compact rio.
>>> Thanks,
>>> Raffaella
>>>
>>> George Jacobs wrote:
>>>> I can hook it up and make a temporary mount of some sort. I thought
>>>> the FT group was working on a N2 panel?
>>>>
>>>> On 7/14/2017 9:07 AM, Amanda Hoebel wrote:
>>>>> Hi George,
>>>>>
>>>>> Could you connect and mount the FT flow meter today?
>>>>>
>>>>> Thanks,
>>>>> Amanda
>>>>>
>>>>> ----- Original Message -----
>>>>> From: "raffaella devita"<Raffaella.Devita at ge.infn.it>
>>>>> To: "Amanda Hoebel"<amandah at jlab.org>
>>>>> Cc: "dsg-ft"<dsg-ft at jlab.org>
>>>>> Sent: Friday, July 14, 2017 8:54:23 AM
>>>>> Subject: Nitrogen pipes
>>>>>
>>>>> Hi Amanda,
>>>>> We have installed the nitrogen lines for the ftcal purge. The still have to be connected to the main line in the hall but they are ready to be connected to the flow meter. Will you take care of that?
>>>>> Also, the flow meter is now sitting on the floor but it would be nice to have a small panel to attach it to the rack . Would that be possible?
>>>>> Thanks ,
>>>>> Raffaella
>>>>
>>>> --
>>>> George Jacobs
>>>> Jefferson Lab (TJNAF)
>>>> STE 12
>>>> 12000 Jefferson Ave.
>>>> Newport News, VA 23606
>>>>
>>>> (office) 757-269-7115
>>>>
>>>> (cell) 757-876-0480
>>>>
>>>> (email)jacobsg at jlab.org
>>>>
>>>> (website)https://userweb.jlab.org/~jacobsg
>>>>
>>>>
>>>> _______________________________________________
>>>> Dsg-ft mailing list
>>>> Dsg-ft at jlab.org
>>>> https://mailman.jlab.org/mailman/listinfo/dsg-ft
>>>
>>
>> --
>> George Jacobs
>> Physics Detector Support Group
>> Jefferson Lab (TJNAF)
>> STE 12
>> 12000 Jefferson Ave.
>> Newport News, VA 23606
>>
>> (office) 757-269-7115
>>
>> (cell) 757-876-0480
>>
>> (email)jacobsg at jlab.org
>>
>> (website)https://userweb.jlab.org/~jacobsg
>>
>
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-hallb_ft/attachments/20170717/463de628/attachment-0002.html>
More information about the Dsg-ft
mailing list