Hi Denny and Bob,

Just a recap of this morning's conversation, DSG will need at least two 
weeks notice of any work which would cause an interruption of N2 to Hall 
B. This will give enough time to order high pressure LN2 dewars to be 
delivered to the hall. This will ensure that the  Aerogel has a 
continuous source of N2 at all times to prevent the absorption of moisture.

Thanks,

Marc


On 5/4/2018 3:57 PM, Amrit Yegneswaran wrote:
> thanks for the explanation george.
> i guess we need liquid N2 cylinders for the RICH, if not high purity 
> N2 cylinders.
> we have to coordinate closely with denny so that we have N2 before 
> hallB engineering starts work.
> amrit
>
> ------------------------------------------------------------------------
> *From: *"George Jacobs" <jacobsg at jlab.org>
> *To: *"Amrit Yegneswaran" <yeg at jlab.org>
> *Sent: *Thursday, May 3, 2018 4:02:31 PM
> *Subject: *Re: [Dsg-internal] Pressure Systems work for Hall B N2 
> distribution system
>
> Hi Amrit,
>
> This was work in progress that was interrupted for the run.
>
> I specified the requirement for a temporary alternative N2 supply to 
> maintain the RICH aerogel purge during the outage.
>
> The work plus pressure testing could take a week or longer. It's 
> important to complete all the required work to eliminate the need for 
> subsequent N2 outages.
>
> The hot work, brazing the fittings for the relief valve, and it's 
> detailed QA requirements, will drive the timing of this work. Then 
> once all the tasks have been accomplished, pressure testing will 
> require at least a day, maybe more.
>
> The bottom line is that this must be well planned.
>
> George
>
> On 5/3/2018 1:50 PM, Amrit Yegneswaran wrote:
>
>     george,
>     was this e-mail of yours in response to a request from someone in
>     HallB, or is it from your bucket list.
>     work must be scheduled such that there is no interruption N2 flow
>     to the RICH.
>     more on monday.
>     amrit
>
>     ------------------------------------------------------------------------
>     *From: *"George Jacobs" <jacobsg at jlab.org>
>     *To: *"Bob Miller" <rmiller at jlab.org>, "Dave Kashy"
>     <kashy at jlab.org>, "Volker Burkert" <burkert at jlab.org>, "Stepan
>     Stepanyan" <stepanya at jlab.org>, "dsg-internal" <dsg-internal at jlab.org>
>     *Sent: *Thursday, May 3, 2018 11:11:49 AM
>     *Subject: *[Dsg-internal] Pressure Systems work for Hall B N2
>     distribution        system
>
>     Hi Bob,
>
>     The pressure systems work for the Hall B N2 distribution system is
>     incomplete. This work was placed on hold until after this run
>     period. This work requires isolation of the Hall B N2 gas supply.
>     A temporary alternative N2 supply will be required to maintain the
>     RICH aerogel purge during the outage.
>
>     Dave Kashy is the DA on this system.
>
>     The following tasks are outstanding;
>     - Relief valve installation
>     - Fwd Carriage flex line replacement
>     - RICH N2 supply valve relocation
>     The following task is NEW;
>     - RICH N2 supply capacity increase (Upgrade)
>     Re-purpose existing ½” gas line to double flow capacity to FWD
>     Carriage to prepare for 2nd RICH N2 flow requirements
>
>     I have attached a pdf showing the N2 supply P&I diagram with the
>     piping changes in red. I have also attached a pdf showing the
>     relief valve installation detail. All the components required for
>     the relief valve installation were stored in the gas shed prior to
>     this run.
>
>     George
>
>     -- 
>     George Jacobs
>     Jefferson Lab (TJNAF)
>     STE 12
>     12000 Jefferson Ave.
>     Newport News, VA 23606
>
>     (office) 757-269-7115
>
>     (cell)   757-876-0480
>
>     (email)jacobsg at jlab.org
>
>     (website)https://userweb.jlab.org/~jacobsg
>
>
>     _______________________________________________
>     Dsg-internal mailing list
>     Dsg-internal at jlab.org
>     https://mailman.jlab.org/mailman/listinfo/dsg-internal
>
>
>     _______________________________________________
>     Dsg-internal mailing list
>     Dsg-internal at jlab.org
>     https://mailman.jlab.org/mailman/listinfo/dsg-internal
>
>
> -- 
> George Jacobs
> Jefferson Lab (TJNAF)
> STE 12
> 12000 Jefferson Ave.
> Newport News, VA 23606
>
> (office) 757-269-7115
>
> (cell)   757-876-0480
>
> (email)jacobsg at jlab.org
>
> (website)https://userweb.jlab.org/~jacobsg
>
> G
> M
> T
> 								
>
> Text-to-speech function is limited to 200 characters
> 		Options 
> <moz-extension://9a02252d-fe80-4f21-89c6-673418b2428d/content/html/options/options.html?bbl> 
> : History 
> <moz-extension://9a02252d-fe80-4f21-89c6-673418b2428d/content/html/options/options.html?hist> 
> : Feedback 
> <moz-extension://9a02252d-fe80-4f21-89c6-673418b2428d/content/html/options/options.html?feed> 
> : Donate 
> <https://www.paypal.com/cgi-bin/webscr?cmd=_s-xclick&hosted_button_id=GD9D8CPW8HFA2> 
> 	Close
>
>
>
> _______________________________________________
> Dsg-internal mailing list
> Dsg-internal at jlab.org
> https://mailman.jlab.org/mailman/listinfo/dsg-internal

-- 
Marc McMullen
Detector Support Group
757-269-7738

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-hallbgas/attachments/20180507/7629c693/attachment-0001.html>


More information about the Dsg-hallbgas mailing list