[dsg-hallb_htcc] HTCC Hall B
Brian Eng
beng at jlab.org
Fri Aug 26 12:50:41 EDT 2022
Thanks Bob,
Since the monitoring used to be installed on SFL3 and has since been moved to SFL1 there should be enough length.
>From what I remember the last time the HTCC was moved to the floor there really isn't anything to do from the monitoring side other than disconnect/reconnect the pressure and H2O sensors (the MFC isn't used anymore and has been replaced with a rotameter).
If any issues come up we can certainly help troubleshoot but I'm not sure why we're needed in the move itself.
________________________________
From: Bob Miller <rmiller at jlab.org>
Sent: Friday, August 26, 2022 12:24 PM
To: Brian Eng <beng at jlab.org>; Youri Sharabian <youris at jlab.org>; Marc Mcmullen <mcmullen at jlab.org>
Cc: Denny Insley <dinsley at jlab.org>; William Phelps <wphelps at jlab.org>
Subject: Re: HTCC Hall B
Hi Brian,
The HTCC is scheduled to be moved from 9-11 pm on Saturday. See line 25 of the attached schedule.
Bob
On 8/26/2022 12:03 PM, Brian Eng wrote:
Hi Denny,
So the plan is to move the HTCC on Saturday? Any idea on what time it will start/finish?
________________________________
From: Youri Sharabian <youris at jlab.org><mailto:youris at jlab.org>
Sent: Friday, August 26, 2022 11:55 AM
To: Brian Eng <beng at jlab.org><mailto:beng at jlab.org>; Marc Mcmullen <mcmullen at jlab.org><mailto:mcmullen at jlab.org>
Cc: Bob Miller <rmiller at jlab.org><mailto:rmiller at jlab.org>; Denny Insley <dinsley at jlab.org><mailto:dinsley at jlab.org>; William Phelps <wphelps at jlab.org><mailto:wphelps at jlab.org>
Subject: HTCC Hall B
Dear Brian and Marc,
It is scheduled to move the HTCC from its current location and put it on the ground floor. The system is scheduled to be disconnected (HV and signal cables, gas supply line, on-line controls) tomorrow evening. All communications have to be disconnected and than connected back to provide same controls and gas supplies while the HTCC is on the ground floor. Of course the detector will be moved back to its original place (scheduled on Wednesday next week) and everything have to be restored.
Your help and supervision is required. Please contact Denny Insley for details and plan to take care about controls as needed. If you let me know when you plan to come to the Hall B area I will join you. Last time HTCC was moved was 4 years ago. I hope you remember that we had continuous monitoring of all parameters with only short (less than 1 hour) interruptions.
Please let me know if there are any difficulties or you need my immediate help regarding the work that needs to be done.
Thank you in advance.
Best regards,
Youri
--
Bob Miller
Hall B Lead Engineer
Jefferson Lab
757 822-9586
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-hallb_htcc/attachments/20220826/566f9a73/attachment.html>
More information about the dsg-hallb_htcc
mailing list