[Dsg-ltcc] [New Logentry] Follow-up Re: Installation of new pressure transducers

mcmullen at jlab.org mcmullen at jlab.org
Fri Aug 3 16:30:04 EDT 2018


Logentry Text:
--
Sector 5 N2 fill is complete. The controller is set to start gas flow if the pressure drops below 2.5 IWC. The deadband is set to shut off the flow at 2.52. After filling the the sector the gas has not flown since, although it has only been a few hours. 

---

This is a plain text email for clients that cannot display HTML.  The full logentry can be found online at https://logbooks.jlab.org/entry/3584092
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-ltcc/attachments/20180803/cf5cdd81/attachment-0001.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: S5 Fill.JPG
Type: image/jpeg
Size: 78442 bytes
Desc: not available
URL: <https://mailman.jlab.org/pipermail/dsg-ltcc/attachments/20180803/cf5cdd81/attachment-0001.jpe>


More information about the Dsg-ltcc mailing list