Dave/Denny,

One of the checks is for the system cable interlock (part of which involves disconnecting individual cables), which means that you'd temporarily lose some temperature readings. I'm guessing this would also mess up the DT calculations too?

Is this okay for us to do this afternoon or should we wait for some other time to do it?

We're going to proceed with other sections of the checklist until we hear back from you guys.

Thanks
--
Brian Eng
Detector Support Group