[Dsg-hallb_magnets] Solenoid I&C Checkout
Dave Kashy
kashy at jlab.org
Tue Aug 22 13:06:46 EDT 2017
Brian,
Is the plan to disconnect each and every cable or just a few. Some of them should trip the interlock that then stops the flow.
We really don't want to do that too many times...
Dave
----- Original Message -----
From: "Brian Eng" <beng at jlab.org>
To: "kashy" <kashy at jlab.org>, "Denny Insley" <dinsley at jlab.org>
Cc: "dsg-hallb magnets" <dsg-hallb_magnets at jlab.org>
Sent: Tuesday, August 22, 2017 12:31:08 PM
Subject: Solenoid I&C Checkout
Dave/Denny,
One of the checks is for the system cable interlock (part of which involves disconnecting individual cables), which means that you'd temporarily lose some temperature readings. I'm guessing this would also mess up the DT calculations too?
Is this okay for us to do this afternoon or should we wait for some other time to do it?
We're going to proceed with other sections of the checklist until we hear back from you guys.
Thanks
--
Brian Eng
Detector Support Group
757-269-6018
More information about the Dsg-hallb_magnets