[Dsg-hallb_magnets] ERR presentation slides Cool down and power up) - 1st draft due 05/19
Pablo Campero
campero at jlab.org
Tue May 23 08:45:38 EDT 2017
Hello Dave,
Thank you for your comments. I will work on them as soon as possible.
Best Regards,
Pablo
From: "Dave Kashy" <kashy at jlab.org>
To: "Pablo Campero" <campero at jlab.org>
Cc: "Ruben Fair" <rfair at jlab.org>
Sent: Friday, May 19, 2017 10:02:10 AM
Subject: Re: [Dsg-hallb_magnets] ERR presentation slides Cool down and power up) - 1st draft due 05/19
Hi Pablo,
I skimmed your slides and here are some comments.
Slide 5: The last note says all sensors ... are controlled...
Is this really true? Do we have limits for all sensors? For example, the LL sensors during initial cooling are not used. You might get a question on this so having details will be helpful
Slide 6: Do you have sensor sample rate tables? (which are fast and which are slower and the actual rates?)
Slide 9: The descriptions in the epics screen need to be filled in
Slide 10: When you say Cascading PID loops will be added... do you mean that the PLC/epics programing is not complete or that the control variables and PID parameters are not setup? Also the reason for Cascade PID's is to allow a single control element (valve/heater) to be controlled by multiple system variables vs just one)
Slide 11: Different control setups are required for many elements depending on the stage/phase of operation, this is more than setpoints. Example: a valve may be in manual mode in phase 1 and PID mode in phase 2 or the control input parameter may be different in a different phase.
Slide 12: Do we have a roots pump on the solenoid?
Slide 14: Thresholds were not received from ETI. JLab determined these( see my talk).
Slide 16: Need to check values, I think we have deleted the first requirement. Also we may need to increase the helium to metal values to achieve a reasonable CD rate. (see temperature plot in my talk...)
Slide 19: Do we have a list of not completed screens? Load Cells line should be highlighted.
Dave
----- Original Message -----
From: "Pablo Campero" <campero at jlab.org>
To: "dsg-hallb magnets" <dsg-hallb_magnets at jlab.org>
Sent: Friday, May 19, 2017 9:07:44 AM
Subject: Re: [Dsg-hallb_magnets] ERR presentation slides Cool down and power up) - 1st draft due 05/19
Hello Ruben,
I have added 1st draft versions of the presentations (Solenoid I & C Cooldown and Solenoid I& C Power up) in the folders that you have indicated.
Best Regards,
Pablo
From: "Ruben Fair" <rfair at jlab.org>
To: "Dave Kashy" <kashy at jlab.org>
Cc: "John Hogan" <hogan at jlab.org>, "Joseph Matalevich" <josephm at jlab.org>, "Pablo Campero Rojas" <campero at jlab.org>, "Probir Ghoshal" <ghoshal at jlab.org>, "Renuka Rajput-Ghoshal" <renuka at jlab.org>, "Glenn Young" <gyoung at jlab.org>, "Bob Miller" <rmiller at jlab.org>, "George Biallas" <biallas at jlab.org>
Sent: Friday, May 19, 2017 7:59:19 AM
Subject: Re: ERR presentation slides Cool down and power up) - 1st draft due 05/19
Thank you Dave.
All,
Please have a look through all the draft presentations presently in the cool down and power up ERR presentation folders over the next few days. And send your comments directly to the presenter.
I shall arrange for a dry run shortly.
M:\hallb_eng\CLAS12\Magnets\Solenoid\ERR Sol Cooldown and Power-Up\ERR Cooldown Solenoid\Presentations
and
M:\hallb_eng\CLAS12\Magnets\Solenoid\ERR Sol Cooldown and Power-Up\ERR-Power-up Solenoid\Presentations
Regards
Ruben
From: "David Kashy" <kashy at jlab.org>
To: "Ruben Fair" <rfair at jlab.org>
Cc: "John Hogan" <hogan at jlab.org>, "Joseph Matalevich" <josephm at jlab.org>, "Pablo Campero Rojas" <campero at jlab.org>, "Probir Ghoshal" <ghoshal at jlab.org>, "Renuka Rajput-Ghoshal" <renuka at jlab.org>, "Glenn Young" <gyoung at jlab.org>, "Bob Miller" <rmiller at jlab.org>, "George Biallas" <biallas at jlab.org>
Sent: Thursday, May 18, 2017 11:55:38 AM
Subject: Re: ERR presentation slides Cool down and power up) - 1st draft due 05/19
I have put a draft of two talks in this folder. \\JLABSGRP\sgroup\hallb_eng\CLAS12\Magnets\Solenoid\ERR Sol Cooldown and Power-Up\ERR Cooldown Solenoid\Presentations
I'm off this afternoon for Dr Appt.
Dave
----- Original Message -----
From: "Ruben Fair" <rfair at jlab.org>
To: "Hogan" <hogan at jlab.org>, "Joseph Matalevich" <josephm at jlab.org>, "kashy" <kashy at jlab.org>, "Pablo Campero Rojas" <campero at jlab.org>, "Probir Ghoshal" <ghoshal at jlab.org>
Cc: "Renuka Rajput-Ghoshal" <renuka at jlab.org>, "Glenn Young" <gyoung at jlab.org>, "Robert Miller" <rmiller at jlab.org>, "George Biallas" <biallas at jlab.org>
Sent: Thursday, May 11, 2017 9:17:05 AM
Subject: ERR presentation slides Cool down and power up) - 1st draft due 05/19
Gentle reminder - 1st draft of slides due by 05/19 for review by Ruben, Glenn, Bob and George.
Regards
Ruben
_______________________________________________
Dsg-hallb_magnets mailing list
Dsg-hallb_magnets at jlab.org
https://mailman.jlab.org/mailman/listinfo/dsg-hallb_magnets
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-hallb_magnets/attachments/20170523/588a6093/attachment.html>
More information about the Dsg-hallb_magnets
mailing list