Hello Amrit,
For your information, on late Friday (9/8/2017), Brian and I completed with the interlock checkouts and instrumentation checks required prior to the Solenoid power up.
Solenoid has been powered up at 100 A during the weekend (9/10/2017). Data acquired during the rump up/down of the magnet will be analyzed this week to then proceed with the full current (2416 A) power up.
Best Regards,
Pablo