Ruben/Probir,
Do you know if there are any plans to power down the magnets prior to the end of the run? Maybe to switch polarity?
NI has suggested enabling some lower level logging, but doing so requires rebooting the cRIO. I'd prefer to do that when the magnet is at 0 current.
I doubt there would be since it's close to the end of the run, but figured I'd ask anyway.
    
    