[Dsg-hallb_magnets] Hall B Magnet Schedule
Ruben Fair
rfair at jlab.org
Mon Apr 23 16:34:11 EDT 2018
Brian
There may be a possibility next Monday. Nick and I would also like to try out the slow dump option but from lower currents.
We will not be powering the solenoid in reverse polarity till the Fall.
I shall let you know.
Ruben
> On Apr 23, 2018, at 4:30 PM, Brian Eng <beng at jlab.org> wrote:
>
> Ruben/Probir,
>
> Do you know if there are any plans to power down the magnets prior to the end of the run? Maybe to switch polarity?
>
> NI has suggested enabling some lower level logging, but doing so requires rebooting the cRIO. I'd prefer to do that when the magnet is at 0 current.
>
> I doubt there would be since it's close to the end of the run, but figured I'd ask anyway.
> _______________________________________________
> Dsg-hallb_magnets mailing list
> Dsg-hallb_magnets at jlab.org
> https://mailman.jlab.org/mailman/listinfo/dsg-hallb_magnets