[Dsg-hallb_magnets] Torus checkout complete for today
    Tyler Lemon 
    tlemon at jlab.org
       
    Mon Jul 13 13:02:30 EDT 2020
    
    
  
Hi Probir,
Pablo and I have finished the Torus checkouts for today.
We still have the hardware liquid helium level and liquid nitrogen level interlock to test. Those values stayed at 100% for the entire time we tried testing it. We’ll check this tomorrow.
We also have to measure the voltage inside the MPS, still.
Since we’ve completed all we can do today in the Hall, we are both returning home to telework the remainder of the day. As discussed, I took the voltage sources and your tool box with me so they do not get lost.
We will be back tomorrow at 8am.
Tyler