[Dsg-hallb_magnets] [Revised Logentry] P005 - Solenoid Pre-Power-Up	interlock checkout complete
    tlemon at jlab.org 
    tlemon at jlab.org
       
    Mon Jun  7 15:35:02 EDT 2021
    
    
  
Logentry Text:
--
P005 - Solenoid Pre-Power-Up interlock checkout has been completed.
We could not perform the Lead Reservoir liquid helium level interlock check since the level never dropped below 100% (max value) and interlock is checked by raising interlock threshold above current liquid level reading.
---
This is a plain text email for clients that cannot display HTML.  The full logentry can be found online at https://logbooks.jlab.org/entry/3879001
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-hallb_magnets/attachments/20210607/11dcb3c7/attachment.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: application-pdf.png
Type: image/png
Size: 346 bytes
Desc: not available
URL: <https://mailman.jlab.org/pipermail/dsg-hallb_magnets/attachments/20210607/11dcb3c7/attachment.png>
    
    
More information about the Dsg-hallb_magnets
mailing list