[Dsg-hallb_magnets] [Revised Logentry] P005 - Solenoid Pre-Power-Up interlock checkout complete

tlemon at jlab.org tlemon at jlab.org
Mon Jun 7 15:35:02 EDT 2021


Logentry Text:
--
P005 - Solenoid Pre-Power-Up interlock checkout has been completed.

We could not perform the Lead Reservoir liquid helium level interlock check since the level never dropped below 100% (max value) and interlock is checked by raising interlock threshold above current liquid level reading.

---

This is a plain text email for clients that cannot display HTML.  The full logentry can be found online at https://logbooks.jlab.org/entry/3879001
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-hallb_magnets/attachments/20210607/11dcb3c7/attachment.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: application-pdf.png
Type: image/png
Size: 346 bytes
Desc: not available
URL: <https://mailman.jlab.org/pipermail/dsg-hallb_magnets/attachments/20210607/11dcb3c7/attachment.png>


More information about the Dsg-hallb_magnets mailing list