[Dsg-mvt] Fwd: Re: MVT Testing in EEL 125

Marc McMullen mcmullen at jlab.org
Tue May 16 16:10:09 EDT 2017


Hi Matt,

Maxime has stated that the MVT will need gas in EEL 125, will the 
current pressure systems analysis for 124 cover this as well, or does 
something need to be done on your end?


Thanks,

Marc



On 5/16/2017 3:54 PM, mdefurne wrote:
> Hi Marc,
>
> We will indeed need gas supply in the room 125. First we will need pure
> argon to run leak test ,ideally, as soon as we get the micromegas out of
> the box. Then, while we add the tiles, we will need to make sure they
> are well connected by taking quick cosmic runs so we will need premix
> gas in the eel. Indeed You want to find out if there is a problem with a
> tile before adding the layer on top of it.
>
> Once everything will be assembled and work well, we will move to clean
> room for SVT integration and take cosmics.
>
> Best,
>
> Maxime
>
>
> Le 16/05/2017 à 15:14, Marc McMullen a écrit :
>> Hi Maxime,
>>
>> I just left the Hall B Engineering meeting a while ago and it was
>> mentioned that the MVT will go through some testing in room 125, which
>> is next door to the clean room. Do you know what type of testing will
>> be done before it goes into the clean room for SVT/MVT integration and
>> will you need a gas supply to do the testing?
>>
>> Thanks,
>>
>

-- 
Marc McMullen
Detector Support Group
757-269-7738