[Dsg-rich] EEL Compressor
Walt Akers / JLAB
akers at jlab.org
Tue Oct 18 13:26:36 EDT 2016
Hey George:
So there are no other electrical receptacles, process water, cooling, gases
or other infrastructure that you need installed - other than the 208V/70Amp
circuit for the compressor?
Walt
George Jacobs wrote:
> Hi Walt,
>
> All the components for this are currently in EEL rm 125.
>
> This diagram was part of the RICH status update from ~ 3 weeks ago.
>
>
>
> On 10/18/2016 11:11 AM, Walt Akers / JLAB wrote:
>> George:
>>
>> We have a plan for the layout of the room, but I had not received any
>> information
>> about the addition of electrical infrastructure. We'll need to do
>> the following:
>>
>> a) walk through the plan and determine where the power needs to be
>> installed to
>> support the compressor,
>> b) determine if there is any power in the area that is available to
>> support this load,
>> if not we'll have to determine where we're routing it from,
>> c) come up with a price and schedule to do the work in time to
>> support this activity.
>>
>> If the price is too high, we may need to think about alternatives,
>> including using
>> a different compressor OR relocating the work to where the power is
>> available.
>>
>> Still, if there is a welding outlet in the room (I'm not sure), we
>> may be able to
>> purchase and use one of the new Bertha's to support this activity.
>> That would
>> be less than $10,000.
>>
>> I will walk the area with Jason as soon as possible. In the meantime,
>> though,
>> please send me a list of all of the electrical and mechanical
>> infrastructure that
>> you need to have installed in the room so we can consider it in its
>> entirety.
>>
>> Jason: I'm doing a walk through of EEL 126 today (2:00 pm) with
>> someone else
>> from Facilities, do you want to check this out at the same time?
>>
>> Walt
>>
>> George Jacobs wrote:
>>> Hi Walt,
>>>
>>> The RICH air compressor has arrived, it is currently in EEL rm 125.
>>> The plan is to install it in the rm 124 clean room. This is a large
>>> unit and requires a new power feed, 208v 3 phase 70 amp service. I
>>> have place a work order to run this new power feed. FM&L needs an
>>> updated floor plan and charge codes for this. The air cooling valve
>>> panel and tank are also complete, rm 125. I thought these were
>>> already in the floor plan.
>>>
>>> Thanks,
>>> George
>>>
>>> On 10/18/2016 10:43 AM, Jason Willoughby wrote:
>>>> George,
>>>>
>>>> Has this compressor been coordinated through Walt? This compressor
>>>> is the first time I've seen such a thing and this was not on Walt's
>>>> overall plan for the room. Please coordinate with him and get back
>>>> to me with a charge code for the work. There really isn't a viable
>>>> close 208 70A source in the area, which means the costs of this
>>>> installation are going to be a bit high.
>>>>
>>>> Jason Willoughby
>>>> FM&L Electrical Engineer
>>>> Thomas Jefferson National Accelerator Facility
>>>> 628 Hofstadter Road STE 1
>>>> Newport News, VA 23606
>>>> (757)-269-5372
>>>
>>> --
>>> George Jacobs
>>> Jefferson Lab (TJNAF)
>>> STE 12
>>> 12000 Jefferson Ave.
>>> Newport News, VA 23606
>>>
>>> (office) 757-269-7115
>>>
>>> (cell) 757-876-0480
>>>
>>> (email)jacobsg at jlab.org
>>>
>>> (website)https://userweb.jlab.org/~jacobsg
>>
>>
>
> --
> George Jacobs
> Jefferson Lab (TJNAF)
> STE 12
> 12000 Jefferson Ave.
> Newport News, VA 23606
>
> (office) 757-269-7115
>
> (cell) 757-876-0480
>
> (email)jacobsg at jlab.org
>
> (website)https://userweb.jlab.org/~jacobsg