Dear Dario:
In looking at the diagram, it does not appear that you incorporated
the Silicon Vertex Tracker setup that is still in the lower right
hand side of the room (as shown). If that is the case, is it your plan
not to occupy the room until the SVT has been fully installed in
Hall B?
Walt
Dario Orecchini wrote:
> Dear all,
> speaking of assembly in EEL 124, in attachement a picture of an
> overall view with (more or less) all the components that wil be
> envolved in the assembly steps, arranged in according to our last
> development of the assembly issues.
>
> Anyway,I and Sandro wil be in Jlab in the week 7th to 11th (november),
> and so we will have some meetings of explanation.
>
> Due the dimension of the file, Im sending you with DROPBOX also the
> step file of the same assembly.
> The link is:
> https://www.dropbox.com/s/oje81y02a46pjrl/Assembly_Integration%20in%20EEL%20124.stp?dl=0
>
> Best regards
> Dario
More information about the Dsg-rich