[Dsg-rich] RICH Assembly in EEL 124, SVT space needed in cleanroom

Walt Akers / JLAB akers at jlab.org
Fri Oct 28 16:15:04 EDT 2016


All:

I did send a couple of revisions to Dario Orecchini this morning that 
allow the
RICH to be rotated without encroaching on space that is currently 
allocated to
other activities.  I've attached a copy of those images.

Still, there may be some wrong thinking here - particularly in regard to the
request for a file showing both SVT and RICH.  Most importantly, just 
because
a space has not been allocated to one activity or the other, does not 
mean it
is available to be absorbed. As I mentioned in an earlier e-mail, there 
are many
activities that will be flowing in and out of all of these spaces over 
the course
of the next couple of years.  In some cases, the new activities will be 
driven by
emerging situations that we won't even know about until they happen. 
Because
of this, some free space must always be maintained --- and all of our 
areas must
be managed carefully.

Having said that, before proposing any sweeping changes to the uses of any
of the spaces - please touch base with me so we can discuss the implications
for all of our colleagues.

Walt



Stepan Stepanyan wrote:
> Tyler,
>
> I think this is done in back order.
>
> We had a layout that worked, if Marco or some one else wants to change 
> the proposed
> layout, they should start from the existing one, respecting other 
> people's needs, meaning
> in this case SVT being in the clean room. Coming up with completely 
> new layout is not
> a way to go.
> I do not know what format Walt's layout is, but that the only one we 
> have for SVT.
>
> Stepan
>
> On 10/28/16 3:49 PM, Tyler Lemon wrote:
>> Dear Stepan,
>>
>> The difference between Walt's video layout and the new layout is the 
>> RICH is rotated 90 degrees. Marco Mirazita and RICH INFN 
>> collaborators would like to have the RICH assembly structure rotated 
>> 90 degrees from Walt's original video design to have better access to 
>> RICH during assembly. This shouldn't affect the overall layout of EEL 
>> 124, but when Dario sent the step file of the new layout Walt 
>> mentioned it should be checked that there would be space for the SVT.
>>
>> Is there a step file that contains the layout of EEL 124 with the 
>> SVT? Could the SVT layout step file and the RICH layout step file be 
>> merged to ensure there will be adequate space for both?
>>
>> Best regards,
>> Tyler
>>
>>
>> ------------------------------------------------------------------------
>> *From: *"Stepan Stepanyan" <stepanya at jlab.org>
>> *To: *dsg-svt at jlab.org, "Walt Akers" <akers at jlab.org>
>> *Sent: *Friday, October 28, 2016 3:32:28 PM
>> *Subject: *Re: [dsg-svt] RICH Assembly in EEL 124,        SVT space 
>> needed in cleanroom
>>
>> Tyler,
>>
>> Some time ago Walt Akers did a layout of the clean room that would 
>> accommodate
>> both SVT and RICH. Why we are now discussing this question again?
>>
>> Also, we always had plans using the clean room over summer 2017 for 
>> final integration
>> of the SVT and and MM trackers. So this should not be pressurize to 
>> anyone that SVT will
>> be  in the clean room toll fall of 2017.
>>
>> Stepan
>>
>> On 10/28/16 3:19 PM, Tyler Lemon wrote:
>>
>>     Hello,
>>
>>     Stepan has informed us that the SVT will be in the big clean room
>>     until late October 2017 (his email below in green). In November
>>     2016, assembly of RICH is scheduled to start in the big clean
>>     room. While planning the layout, it was mentioned that the
>>     planned layout might not accommodate the SVT in the clean room.
>>
>>     INFN collaborators have created a step file for the big clean
>>     room for RICH assembly. Could the SVT group confirm whether the
>>     RICH assembly layout will leave enough space for the SVT
>>     remaining in the clean room until late October 2017? Thank you in
>>     advance.
>>
>>     Dropbox link to layout step file:
>>     *https://www.dropbox.com/s/oje81y02a46pjrl/Assembly_Integration%20in%20EEL%20124.stp?dl=0
>>     *
>>     *
>>     *
>>     Best regards,
>>     Tyler
>>
>>     *From: *"Stepan Stepanyan" <stepanya at jlab.org>
>>     *To: *"dsg-rich" <dsg-rich at jlab.org>
>>     *Sent: *Friday, October 28, 2016 9:24:05 AM
>>     *Subject: *Re: [Dsg-rich] Assembly in EEL 124
>>
>>     Hi everyone,
>>
>>     Just to make clear, the Hall-B Silicon tracker will be in clean room
>>     until fall of 2017.
>>     Over summer it will be worked at to install micro-mega gas detectors.
>>
>>     Stepan
>>
>>
>>
>>
>>     _______________________________________________
>>     dsg-svt mailing list
>>     dsg-svt at jlab.org
>>     https://mailman.jlab.org/mailman/listinfo/dsg-svt
>>
>>
>>
>> _______________________________________________
>> dsg-svt mailing list
>> dsg-svt at jlab.org
>> https://mailman.jlab.org/mailman/listinfo/dsg-svt
>>
>>
>>
>> _______________________________________________
>> dsg-svt mailing list
>> dsg-svt at jlab.org
>> https://mailman.jlab.org/mailman/listinfo/dsg-svt
>

-------------- next part --------------
A non-text attachment was scrubbed...
Name: RICHArrangeVersion2.jpg
Type: image/jpeg
Size: 1041733 bytes
Desc: not available
URL: <https://mailman.jlab.org/pipermail/dsg-hallb_rich/attachments/20161028/891ad252/attachment-0008.jpg>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: RICHArrangeVersion2-CraneBefore.jpg
Type: image/jpeg
Size: 772320 bytes
Desc: not available
URL: <https://mailman.jlab.org/pipermail/dsg-hallb_rich/attachments/20161028/891ad252/attachment-0009.jpg>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: RICHArrangeVersion2-CraneAfter.jpg
Type: image/jpeg
Size: 773397 bytes
Desc: not available
URL: <https://mailman.jlab.org/pipermail/dsg-hallb_rich/attachments/20161028/891ad252/attachment-0010.jpg>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: RICHArrangeVersion2-Installed.jpg