[Dsg-rich] Frontal panels assembly tool

dario.orecchini at lnf.infn.it dario.orecchini at lnf.infn.it
Thu Aug 10 08:25:31 EDT 2017


Hi guys, some information about the last components arrived from Italy to Jlab.

There's the components needed to realize the tool devoted to assembly and mounting on the RICH, the frontals panel (lower and upper).

On the shipping document, probably there are more items.
Item A, these components are for the collaboration of Argonne;
         B, these are the components needed here for the frontal panel assembly.

The tool for the panels assembly is similar to whose of the E_Panel one, and the mounting instruction are now on the wiki.
If is possible, the DSG group can, could procede to assembly it. 
Thanks
Dario

Sent from Mail for Windows 10

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-rich/attachments/20170810/720fa27a/attachment.html>


More information about the Dsg-rich mailing list