[Dsg-rich] N2 and Cooling distribution
Marc McMullen
mcmullen at jlab.org
Wed Jul 19 10:46:16 EDT 2017
Hi Sandro,
Thanks for completing the design, i will add this to the OSP documents.
Will there be a distribution for compressed air?
Thanks,
Marc
On 7/19/2017 10:18 AM, Tomassini Sandro wrote:
> Hi Marc,
>
> attached this email there is the nitrogen distribution scheme inside
> the RICH detector.
>
>
>
> Il 14/07/2017 15:28, Marc McMullen ha scritto:
>> Hi Sandro,
>>
>> I need a drawing/sketch of the nitrogen and cooling distribution
>> (with tube dimensions), and a general flow path, including any
>> manifolds for the OSP. The supply lines are 1/2" for compressed air
>> and 1/4" for nitrogen. That is the last thing the pressure systems
>> expert has requested to sign the OSP. I have already made the other
>> requested changes. This does not have to be an official drawing.
>>
>> Changes: Specify pressure systems awareness for staff and users.
>> Attach the gas operation procedure. Specific verbage in the text
>> ("should to shall").
>>
>> Thanks,
>>
>
>
>
> _______________________________________________
> Dsg-rich mailing list
> Dsg-rich at jlab.org
> https://mailman.jlab.org/mailman/listinfo/dsg-rich
--
Marc McMullen
Detector Support Group
757-269-7738
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-hallb_rich/attachments/20170719/e8db5ac3/attachment-0002.html>
More information about the Dsg-rich
mailing list