[Dsg-rich] [Dsg-internal] RICH N2 and Air modifications
Amrit Yegneswaran
yeg at jlab.org
Mon Nov 20 17:52:05 EST 2017
thanks for the info marc.
From: "Marc Mcmullen" <mcmullen at jlab.org>
To: "dsg-internal" <dsg-internal at jlab.org>
Sent: Monday, November 20, 2017 4:32:25 PM
Subject: [Dsg-internal] RICH N2 and Air modifications
Hi Amrit,
I just spoke with Marco Mirazita. Currently, they are running both air
and N2 while they are testing the lower flow limit (N2 @ 20slm) to see
the effect on humidity, after the humidity settles they plan to lower
the flow even more and test.
George has started pre-assembly for installation of the new filter for
N2 and 2 more lines for dewar connection. To complete these
modifications we will have to stop flow and de-pressurize the system. So
we will have to do this once they are done testing.
Marco told me that they will not be able to install the Aerogel this
week, he is says he needs to confirm this with Marco C. But he told me
there was no need to run N2 over the long weekend. Marco also says they
are going to discuss closing off the air exhausts to help with the N2
leak through the e-panel as part of the testing.
In any event, we are preparing for the modifications. We have 2 dewars
online, 2 dewars on deck, and 2 dewars on order.
Walt is adding Room 124 and 125 to the "do not kill power" list for the
holiday shutdown, and he has reached out to Carrol Jones about the
temperature change.
Thanks,
--
Marc McMullen
Detector Support Group
757-269-7738
_______________________________________________
Dsg-internal mailing list
Dsg-internal at jlab.org
https://mailman.jlab.org/mailman/listinfo/dsg-internal
G
M
T
Text-to-speech function is limited to 200 characters
Options : History : Feedback : Donate Close
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-rich/attachments/20171120/df85b5de/attachment.html>
More information about the Dsg-rich
mailing list