Hi Dario,
We have looked into the issue with the drawings for the Trolley parts.
It looks like the drawings have been corrected however Jlab has sent the
shop drawings on multiple occasions.
1. Quote
2. Procurement Quote
3. Final
4. Revised Trolley parts (partial set)
The Trolley part set should be combined with the revised Trolley parts
and reissued as a set. When the set is done all pages should have the
revision section of the title block updated. For instance (Rev. 5), once
done Bob can check the drawings and let me know and I will ask GandR to
throw out all the old drawings and only used the new revision set.
Regards,
Marc
On 9/7/2017 2:23 PM, Marc McMullen wrote:
> Hi Dario,
>
> GandR just called and requested that you review the Trolley parts
> drawings. Sheet 3_8 and 6_8 of the updated drawings have hole spacings
> on the I-beam of 2.3 inches but the lateral and central counterplates
> on 4_8 and 7_8 were not adjusted. So the drawing has them at 2.5 inches.
>
> Please review the drawings and communicate changes with Bob Miller.
>
> Bob,
>
> After you approve of the changes please let me know and I will forward
> the info to the shop and tell them to proceed. Currently, they are
> holding on the Trolley parts.
>
> Regards,
>
>
>
> _______________________________________________
> Dsg-rich mailing list
> Dsg-rich at jlab.org
> https://mailman.jlab.org/mailman/listinfo/dsg-rich
--
Marc McMullen
Detector Support Group
757-269-7738
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-hallb_rich/attachments/20170908/2f8c6476/attachment-0002.html>
More information about the Dsg-rich
mailing list