[dsg-hallb_rich] [EXTERNAL] Re: All aerogel moved into new dry cabinet
Marco Mirazita
Marco.Mirazita at lnf.infn.it
Thu May 27 04:03:23 EDT 2021
Hi Tyler,
from my log, I can say this is a tile delivered after the installation
of the first module, one of those we didn't install in the last row of
the 3 cm layer.
So, it was stored in the cabinet since more than 3 years.
It would be interesting to know its storage conditions. For example, was
it close to the dry unit? Or with other tiles stacked on top of it?
Thank you
Marco
Il 2021-05-26 16:37 Tyler Lemon ha scritto:
> Hello,
>
> All aerogel has been moved into the new dry cabinet in EEL 124.
>
> The monitoring cRIO has also been moved. I am waiting on computer
> center to enable the network ports on the wall the cRIO is connected
> to to be able to verify it is running okay.
>
> When moving the tiles, I did notice that one tile, tile 428f6, had
> cracked pretty significantly. Attached is a photo of the tile. I left
> this tile is in the right bay of the dry cabinet on a shelf by itself.
>
>
> Tyler
> _______________________________________________
> dsg-hallb_rich mailing list
> dsg-hallb_rich at jlab.org
> https://mailman.jlab.org/mailman/listinfo/dsg-hallb_rich
More information about the dsg-hallb_rich
mailing list